Risk and uncertainty in managing chemical manufacturing supply chains

被引:103
作者
Applequist, GE [1 ]
Pekny, JF [1 ]
Reklaitis, GV [1 ]
机构
[1] Purdue Univ, Sch Chem Engn, W Lafayette, IN 47907 USA
关键词
risk and uncertainty; supply chains; metric;
D O I
10.1016/S0098-1354(00)00585-8
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A new metric is presented for evaluating supply chain design and planning projects in which there are significant elements of uncertainty and thus risk. The risk premium construct provides the basis for a rational balance between expected value of investment performance and variance. An effective polytope integration method for evaluation of expected values and variances of revenue is adopted which can account for the effects of demand uncertainties on revenue while recognizing the uncertainty in inventory over time. The combination of these elements with conventional deterministic mathematical programming models offers the promise of providing an effective approach to accommodating uncertainties and a rational basis for balancing risk. A small scale example is used to contrast the proposed approach with conventional stochastic programming-based methods. Another example shows the nature of the return and risk for a multiperiod production plan with stochastic effects on inventory. The computational complexities which are introduced by the risk premium construct are reviewed, and some directions for future research discussed. (C) 2000 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:2211 / 2222
页数:12
相关论文
共 19 条
[1]   Robust process planning under uncertainty [J].
Ahmed, S ;
Sahinidis, NV .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (05) :1883-1892
[2]   Approaches to asynchronous decentralized decision making [J].
Androulakis, IP ;
Reklaitis, GV .
COMPUTERS & CHEMICAL ENGINEERING, 1999, 23 (03) :341-355
[3]  
APPLEQUIST GE, 1999, P FDN COMP AID PROC
[4]   Integration and computational issues in stochastic design and planning optimization problems [J].
Bernardo, FP ;
Pistikopoulos, EN ;
Saraiva, PM .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1999, 38 (08) :3056-3068
[5]   Robust investment model for long-range capacity expansion of chemical processing networks under uncertain demand forecast scenarios [J].
Bok, JK ;
Lee, H ;
Park, S .
COMPUTERS & CHEMICAL ENGINEERING, 1998, 22 (7-8) :1037-1049
[6]  
BOSE S, 1999, P AICHE 1999 ANN M D
[7]  
BREALEY R, 1983, INTRO RISK RETURN CO
[8]  
BUELER B, 1998, EXACT VOLUME COMPUTA
[9]   OPTIMUM DESIGN OF CHEMICAL-PLANTS WITH UNCERTAIN PARAMETERS [J].
GROSSMANN, IE ;
SARGENT, RWH .
AICHE JOURNAL, 1978, 24 (06) :1021-1028
[10]   A bilevel decomposition algorithm for long-range planning of process networks [J].
Iyer, RR ;
Grossmann, IE .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (02) :474-481