Design of a facility layout problem in cellular manufacturing systems with stochastic demands

被引:76
作者
Tavakkoli-Moghaddam, R.
Javadian, N.
Javadi, B.
Safaei, N.
机构
[1] Univ Tehran, Fac Engn, Dept Ind Engn, Tehran, Iran
[2] Mazandaran Univ Sci & Technol, Dept Ind Engn, Babol Sar, Iran
[3] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
关键词
machine/cellular layout; intra/inter-cell movement; CMS; stochastic demands;
D O I
10.1016/j.amc.2006.05.172
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
This paper presents a new mathematical model to solve a facility layout problem in cellular manufacturing systems (CMSs) with stochastic demands. The objective is to minimize the total costs of inter and intra-cell movements in both machine and cell layout problems simultaneously. This model depends on the attitude of the decision maker towards uncertainty in such a way that the optimal layout in CMSs can be changed significantly. A number of instances are optimally solved by the Lingo software to validate and verify the proposed model. Finally, computational results are reported and analyzed. (c) 2006 Elsevier Inc. All rights reserved.
引用
收藏
页码:721 / 728
页数:8
相关论文
共 15 条
[1]   INTEGRATING THE GROUPING AND LAYOUT PROBLEMS IN CELLULAR MANUFACTURING SYSTEMS [J].
ALFA, AS ;
CHEN, MY ;
HERAGU, SS .
COMPUTERS & INDUSTRIAL ENGINEERING, 1992, 23 (1-4) :55-58
[2]   Cell formation and layout designs in a cellular manufacturing environment - a case study [J].
Bazargan-Lari, M ;
Kaebernick, H ;
Harraf, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (07) :1689-1709
[3]   A FACILITY LAYOUT METHOD FOR FLEXIBLE MANUFACTURING SYSTEMS [J].
DAS, SK .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (02) :279-297
[4]   A hybrid approach for concurrent layout design of cells and their flow paths in a tree configuration [J].
Ho, YC ;
Moodie, CL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (04) :895-928
[5]   ALGORITHMS FOR ROBUST SINGLE AND MULTIPLE PERIOD LAYOUT PLANNING FOR MANUFACTURING SYSTEMS [J].
KOUVELIS, P ;
KURAWARWALA, AA ;
GUTIERREZ, GJ .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 63 (02) :287-303
[6]   A continuous approach to considering uncertainty in facility design [J].
Norman, BA ;
Smith, AE .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (06) :1760-1775
[7]  
OLSON DL, 1987, J OPER RES SOC, V38, P261
[8]   THE SINGLE PERIOD STOCHASTIC PLANT LAYOUT PROBLEM [J].
ROSENBLATT, MJ ;
KROPP, DH .
IIE TRANSACTIONS, 1992, 24 (02) :169-176
[9]   The cellular manufacturing layout problem [J].
Salum, L .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (05) :1053-1069
[10]  
SHORE RH, 1980, AIIE T, V12, P200