Quantifying sensitivities of PSHA for France to earthquake catalog uncertainties, truncation of ground-motion variability, and magnitude limits

被引:45
作者
Beauval, C [1 ]
Scotti, O [1 ]
机构
[1] Bur Evaluat Risques Sism Surete Installat, Inst Radioprotect & Surete Nucl, F-92262 Fontenay Aux Roses, France
关键词
D O I
10.1785/012003246
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
The results of this study clearly identify four key parameters controlling the estimation of probabilistic seismic hazard assessment (PSHA) in France in the framework of the Cornell-McGuire method. Results in terms of peak ground acceleration demonstrate the equally high impact, at all return periods, of the choice of truncation of the predicted ground-motion distribution (at + 2sigma) and of the choice between two different magnitude-intensity correlations. The choice of minimum magnitude (3.5/4.5) on hazard estimates can have an important impact at small return periods (<1000 years), whereas the maximum magnitude (6.5/7.0), on the other hand, is not a key parameter even at large return periods (10,000 years). This hierarchy of impacts is maintained at lower frequencies down to 5 Hz. Below 5 Hz, the choice of the maximum magnitude has a much greater impact, whereas the impact due to the choice of the minimum magnitude disappears. Moreover, variability due to catalog uncertainties is also quantified; these uncertainties that underly all hazard results can engender as high a variability as the controlling parameters. Parameter impacts, calculated at the centers of each source zone, show a linear trend with the seismicity models of the zone, demonstrating the lack of contributions coming from neighboring zones. Indeed, the region of influence that contributes to the PSHA estimate at a given site decreases with increasing return periods. The resulting overall variability in hazard estimates due to input uncertainties is quantified through a logic tree, obtained coefficients of variation vary between 10% and 20%. Until better physical models are obtained, the uncertainty on hazard estimates may be reduced by working on an appropriate magnitude-intensity correlation.
引用
收藏
页码:1579 / 1594
页数:16
相关论文
共 41 条
[1]  
ABRAHAMSON NA, 2000, GEOENG 2000 C AUSTR
[2]  
Aki K., 1965, Bull. Earthq. Res. Inst., V43, P237
[3]  
Ambraseys NN, 1996, EARTHQ ENG STRUCT D, V25, P371, DOI 10.1002/(SICI)1096-9845(199604)25:4<371::AID-EQE550>3.0.CO
[4]  
2-A
[5]   THE PREDICTION OF EARTHQUAKE PEAK GROUND ACCELERATION IN EUROPE [J].
AMBRASEYS, NN .
EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 1995, 24 (04) :467-490
[6]  
Anderson J. G., 1999, Seismological Research Letters, V70, P19, DOI [10.1785/gssrl.70.1.19, DOI 10.1785/GSSRL.70.1.19]
[7]  
Anderson JG, 1999, B SEISMOL SOC AM, V89, P456
[8]  
Autran A, 1998, P 11 ECEE PAR FRANC
[9]   Source parameters of the 11 June 1909, Lambesc (Provence, southeastern France) earthquake: A reappraisal based on macroseismic, seismological, and geodetic observations [J].
Baroux, E ;
Pino, NA ;
Valensise, G ;
Scotti, O ;
Cushing, ME .
JOURNAL OF GEOPHYSICAL RESEARCH-SOLID EARTH, 2003, 108 (B9)
[10]   Mapping b-values in France using two different magnitude ranges: Possible non power-law behavior [J].
Beauval, C ;
Scotti, O .
GEOPHYSICAL RESEARCH LETTERS, 2003, 30 (17) :SDE1-1