Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms

被引:71
作者
ElMaraghy, H [1 ]
Patel, V
Ben Abdallah, I
机构
[1] Univ Windsor, IMS Ctr, Windsor, ON, Canada
[2] Gen Motors Truck Grp, Pontiac, MI USA
[3] SABRE Grp, Southlake, TX USA
关键词
scheduling; dual resources; flexible manufacturing systems; genetic algorithms;
D O I
10.1016/S0278-6125(00)80011-4
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Scheduling belongs to the special class of NP-hard problems for which no polynomial time algorithm has been found. Therefore, a schedule that is the best possible near-optimal solution is often acceptable. This paper presents a scheduling approach, based on Genetic Algorithms (GAs), developed to address the scheduling problem in manufacturing systems constrained by both machines and workers. This genetic algorithm utilizes a new chromosome representation, which takes into account machine and worker assignments to jobs. A set of experiments for determining the best staffing level and machine and worker assignment to jobs was performed. A study was conducted using dispatching rules with various performance measures for two types of shop characteristics: (i) dual-resource (machines and workers) constrained, and (ii) single-resource constrained (machines only). An example is used for illustration and comparison. The resulting scheduling methodology is capable of determining the best staffing level and dispatching rules for the chosen performance measure in both single and dual-resource constrained shops. Decisions to adopt the prescribed staffing strategy to improve the primary performance measures such as mean flow time, mean tardiness, and mean waiting time must be balanced by managers against the potential increase in direct cost. The developed scheduling approach and formulation proved to be very useful for optimizing production performance under the realistic conditions imposed by both machine and worker availability constraints. Such a tool should be used to define a priori the best dispatching rules and schedules for a given set of production requirements and objectives.
引用
收藏
页码:186 / 201
页数:16
相关论文
共 29 条
[1]  
[Anonymous], 1988, P 1988 ROCKY MOUNTAI
[2]  
[Anonymous], PROC INT CARTOGR ASS, DOI DOI 10.5194/ICA-PROC-4-10-2021
[3]  
BEASLEY D, 1993, U COMPUT, V15, P58
[4]   GENETIC ALGORITHMS AND JOB SHOP SCHEDULING [J].
BIEGEL, JE ;
DAVERN, JJ .
COMPUTERS & INDUSTRIAL ENGINEERING, 1990, 19 (1-4) :81-91
[5]  
Davis L., 1985, P INT C GENETIC ALGO, P136
[6]  
FALKENAUER E, 1991, 1991 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-3, P824, DOI 10.1109/ROBOT.1991.131689
[7]   LABOR FLEXIBILITY AND STAFFING LEVELS IN A DUAL-RESOURCE CONSTRAINED JOB-SHOP [J].
FELAN, JT ;
FRY, TD ;
PHILIPOOM, PR .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (10) :2487-2506
[8]   LABOR FLEXIBILITY IN MULTIECHELON DUAL-CONSTRAINT JOB SHOPS [J].
FRYER, JS .
MANAGEMENT SCIENCE SERIES A-THEORY, 1974, 20 (07) :1073-1080
[9]   Scheduling research in multiple resource constrained job shops: A review and critique [J].
Gargeya, VB ;
Deane, RH .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) :2077-2097
[10]  
Goldberg D. E., 1989, GENETIC ALGORITHMS S