Integrated batch size and setup reduction decisions in multi-product, dynamic manufacturing environments

被引:13
作者
Diaby, M [1 ]
机构
[1] Univ Connecticut, Operat & Informat Management Dept, Coll Business, Storrs, CT 06269 USA
关键词
production planning; setup reduction; continuous improvement; Kaizen; large-scale optimization;
D O I
10.1016/S0925-5273(00)00021-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We present a comprehensive model for simultaneously planning for the setup time reductions and the batch sizes of several products over a finite planning horizon in a capacitated manufacturing environment. It is assumed that by investing in the appropriate amounts of various resources (such as R&D time, equipment, fixtures, tooling, re-layout, etc.) setup times can be reduced. The problem is to determine how much to cut the setup time for each product and how much of each product to produce in each period of the planning horizon so that total costs are minimized, subject to limits on the manufacturing and setup reduction resources. A nonlinear, mixed-integer mathematical programming model of this problem is formulated and a heuristic method is developed for solving it. The proposed model is broad and can be directly applied in a variety of practical situations including the case where discrete technology choices must be made. (C) 2000 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:219 / 233
页数:15
相关论文
共 29 条
[1]  
ACORD T, 1998, FURNITURE DESIGN MAN, V70, P22
[2]   OPTIMAL LOT-SIZING ALGORITHMS FOR COMPLEX PRODUCT STRUCTURES [J].
AFENTAKIS, P ;
GAVISH, B .
OPERATIONS RESEARCH, 1986, 34 (02) :237-249
[3]   COMPUTATIONALLY EFFICIENT OPTIMAL-SOLUTIONS TO THE LOT-SIZING PROBLEM IN MULTISTAGE ASSEMBLY SYSTEMS [J].
AFENTAKIS, P ;
GAVISH, B ;
KARMARKAR, U .
MANAGEMENT SCIENCE, 1984, 30 (02) :222-239
[4]   Investment policy for multiple product setup reduction under budgetary and capacity constraints [J].
Banerjee, A ;
Pyreddy, VR ;
Kim, SL .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1996, 45 (1-3) :321-327
[5]  
BYRNE A, 1995, TARGET, V11
[6]   OPTIMAL SETUP TIME REDUCTION FOR A SINGLE-PRODUCT WITH DYNAMIC DEMANDS [J].
DIABY, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 85 (03) :532-540
[7]   A LAGRANGEAN RELAXATION APPROACH FOR VERY-LARGE-SCALE CAPACITATED LOT-SIZING [J].
DIABY, M ;
BAHL, HC ;
KARWAN, MH ;
ZIONTS, S .
MANAGEMENT SCIENCE, 1992, 38 (09) :1329-1340
[8]  
FISHER ML, 1981, MANAGE SCI, V22, P1
[9]  
FREELAND J. R., 1990, J OPERATIONS MANAGEM, V9, P85
[10]  
Geoffrion A, 1974, MATHEMATICAL PROGRAM, V2, P82, DOI DOI 10.1007/BFB0120690