Cyclic and non-cyclic scheduling of 12 h shift nurses by network programming

被引:82
作者
Millar, HH [1 ]
Kiragu, M
机构
[1] St Marys Univ, Finance & Management Sci Dept, Halifax, NS B3H 3C3, Canada
[2] Tech Univ Nova Scotia, Dept Ind Engn, Halifax, NS B3J 2X4, Canada
关键词
D O I
10.1016/S0377-2217(97)00006-4
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we present a mathematical model for cyclic and non-cyclic scheduling of 12 h shift nurses. The model exploits the fact that a nurse's schedule is made up of an alternating sequence of work-stretch and 'off-stretch patterns. We introduce a concept called a stint, which is a pattern characterized by a start date, a length, a 'cost' and the shifts worked. Using the stints as nodes in a network, we construct an acyclic graph on which the nurse's schedules can be defined. The resulting model is essentially a shortest-path problem with side constraints. The model is quite flexible and can accommodate a variety of constraints. With a minor modification, the network is used to define both the cyclic and non-cyclic scheduling problems. The models are illustrated on sample data from a local hospital and solved using CPLEX optimization software on an IBM RISC6000/330 workstation. (C) 1998 Elsevier Science B.V.
引用
收藏
页码:582 / 592
页数:11
相关论文
共 21 条
[1]  
ANAS M, 1994, THESIS TU NOVA SCOTI
[2]   A MULTIPLE OBJECTIVE NURSE SCHEDULING MODEL [J].
ARTHUR, JL ;
RAVINDRAN, A .
AIIE TRANSACTIONS, 1981, 13 (01) :55-60
[3]   SCHEDULING A FULL-TIME WORKFORCE TO MEET CYCLIC STAFFING REQUIREMENTS [J].
BAKER, KR .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1974, 20 (12) :1561-1568
[4]   A NETWORK MODEL FOR THE ROTATING WORKFORCE SCHEDULING PROBLEM [J].
BALAKRISHNAN, N ;
WONG, RT .
NETWORKS, 1990, 20 (01) :25-42
[5]  
BATHOLDI JJ, 1980, OPER RES, V28, P1074
[6]  
BERRADA I, 1994, MULTIOBJECTIVE APPRO
[7]  
BURNS R, 1993, 10 HOUR MULTIPLE SHI
[8]   WORK FORCE SIZE AND SINGLE SHIFT SCHEDULES WITH VARIABLE DEMANDS [J].
BURNS, RN ;
CARTER, MW .
MANAGEMENT SCIENCE, 1985, 31 (05) :599-607
[9]  
BURNS RN, 1978, INFOR, V16, P101
[10]   A MODULAR APPROACH TO OPTIMAL MULTIPLE-SHIFT MANPOWER SCHEDULING [J].
BURNS, RN ;
KOOP, GJ .
OPERATIONS RESEARCH, 1987, 35 (01) :100-110