Stochastic risk assessment of sites contaminated by hazardous wastes

被引:35
作者
Batchelor, B [1 ]
Valdes, J
Araganth, V
机构
[1] Texas A&M Univ, Dept Civil Engn, College Stn, TX 77843 USA
[2] Univ Arizona, Dept Civil Engn & Engn Mech, Tucson, AZ 85721 USA
来源
JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE | 1998年 / 124卷 / 04期
关键词
D O I
10.1061/(ASCE)0733-9372(1998)124:4(380)
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Stochastic risk assessment models offer the potential for being more objective by explicitly considering variability. Such a model has been developed for a site contaminated with polychlorinated biphenyls (PCBs) by representing the parameters used in the risk assessment as probability distribution functions (pdf) rather than single values. The pdf for total risk calculated by the model is approximately lognormal, although the pdf of parameters in the model take on a variety of forms. A first-order approximation to the model provides good estimates for the high end of the distribution, which is of concern when conservative risk assessments are desirable. The first-order approximation provides good estimates even when the level of variation of the parameters is increased well above levels that are normally expected. A procedure was developed to apply the stochastic risk assessment model in a series of calculations to determine preliminary remediation goals for the site. In addition, a simplified technique was developed to calculate preliminary remediation goals using only results from simulating risk with initial site conditions.
引用
收藏
页码:380 / 388
页数:9
相关论文
共 25 条
[1]   INTESTINAL-ABSORPTION OF POLYCHLORINATED BIPHENYLS IN RATS [J].
ALBRO, PW ;
FISHBEIN, L .
BULLETIN OF ENVIRONMENTAL CONTAMINATION AND TOXICOLOGY, 1972, 8 (01) :26-&
[2]  
Allen J R, 1974, Arch Environ Contam Toxicol, V2, P86
[3]  
[Anonymous], 1975, AERONAUT J
[4]  
Benjamin JR., 1970, PROBABILITY STAT DEC
[5]   BIVARIATE DISTRIBUTIONS FOR HEIGHT AND WEIGHT OF MEN AND WOMEN IN THE UNITED-STATES [J].
BRAINARD, J ;
BURMASTER, DE .
RISK ANALYSIS, 1992, 12 (02) :267-275
[6]  
BURMASTER DE, 1989, KSUPERFUND 89
[7]  
DAVIS JA, 1993, EPA600S93006 RS KERR
[8]  
*ERM SW INC, 1988, 9115 WO ERM SW INC
[9]  
Gilbert R.O., 1987, STAT METHODS ENV POL
[10]   Risk variability due to uniform soil remediation goals [J].
Labieniec, PA ;
Dzombak, DA ;
Siegrist, RL .
JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE, 1996, 122 (07) :612-621