High-speed rail in Taiwan: New experience and issues for future development

被引:123
作者
Cheng, Yung-Hsiang [1 ]
机构
[1] Natl Cheng Kung Univ, Dept Transportat & Commun Management Sci, Tainan 701, Taiwan
关键词
High speed rail; Build-operate-transfer; Taiwan; Integration; Transportation impact; TRAIN; IMPACT; TRAVEL;
D O I
10.1016/j.tranpol.2009.10.009
中图分类号
F [经济];
学科分类号
02 ;
摘要
This Study aims to identify some possible issues and challenges for Taiwan's High Speed Rail (HSR) system, which was constructed and is operated under a Build-Operate-Transfer (BOT) model. The operational experiences in the initial stage for equivalent systems in Japan, France, Germany, and elsewhere are introduced herein. This study first presents Taiwan's HSR system development and conducts an ex post cost-benefit analysis of this transportation system. Second, unsatisfied ridership is examined to look for possible solutions to increase it. Third, the paper examines the impact of HSR on the intercity transportation market. Finally, the integration between HSR and various existing transportation modes is discussed. Several policy suggestions are included, which are useful for the decision makers of transportation systems' entrepreneurs, the central government, and the local authorities to derive a comprehensive post-HSR planning strategy for a more integrated transportation system. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:51 / 63
页数:13
相关论文
共 22 条