A strategy for prioritising interactive measures for enhancing energy efficiency of air-conditioned buildings

被引:24
作者
Lee, WL [1 ]
Yik, FWH
Jones, P
机构
[1] Hong Kong Polytech Univ, Dept Bldg Serv Engn, Res Ctr Bldg Environm Performance, Kowloon, Hong Kong, Peoples R China
[2] Cardiff Univ, Welsh Sch Architecture, Cardiff, S Glam, Wales
关键词
D O I
10.1016/S0360-5442(03)00005-7
中图分类号
O414.1 [热力学];
学科分类号
摘要
Within a given budget, selection of the optimal set of measure's for enhancing the energy efficiency of a building is often based on the relative order of the feasible measures, prioritised according to either the life cycle cost saving or the economic benefit-cost ratio of the measures. A sensitivity analysis shows that, compared to the life cycle cost analysis, the benefit-cost ratio analysis is less susceptible to the influence of uncertainties in the estimates of the present value of the life cycle energy saving and cost. Where interactive measures are involved, the effects of some are dependent on the co-existence of other measures. The prioritisation determined according to the benefit-cost ratios of. individual measures, each taken in the absence of all the others, can lead to the choice of a range of measures that is below optimal. Selection of the optimal set of energy efficiency enhancement measures requires a multistep approach, which is exemplified by the case study described in the paper. (C) 2003 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:877 / 893
页数:17
相关论文
共 41 条
  • [1] ALEXANDER DK, 1994, HTB2 MODEL THERMAL E
  • [2] [Anonymous], COD PRACT EN EFF LIG
  • [3] ASHRAE, 1993, HDB FUND
  • [4] *AUD COMM, 1999, 33 HONG KONG SAR GOV, pCH2
  • [5] Barron W, 1999, HEADING SUSTAINABILI
  • [6] Informing the decision makers on the cost and value of green building
    Bartlett, E
    Howard, N
    [J]. BUILDING RESEARCH AND INFORMATION, 2000, 28 (5-6) : 315 - 324
  • [7] BIRDSALL N, 1993, FINANCE DEV MAR
  • [8] *BUILD DEP, 1995, COD PRACT OV THERM T
  • [9] *CENS STAT DEP, 2001, HONG KONG EN STAT AN
  • [10] Assessing the cost effectiveness of an environmental assessment scheme
    Chau, CK
    Burnett, J
    Lee, WL
    [J]. BUILDING AND ENVIRONMENT, 2000, 35 (04) : 307 - 320