Knowledge management in process planning

被引:88
作者
Denkena, B. [1 ]
Shpitalni, M.
Kowalski, P.
Molcho, G.
Zipori, Y.
机构
[1] Leibniz Univ Hannover, Produktionstech Zentrum, Inst Fertigungstech & Werkzeugmaschinen, D-30167 Hannover, Germany
[2] Technion Israel Inst Technol, Fac Mech Engn, Lab CAD & LCE, IL-32000 Haifa, Israel
关键词
CAPP; abrasive processes; knowledge management;
D O I
10.1016/j.cirp.2007.05.042
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Considerable research and development efforts have been devoted to Computer Aided Process Planning (CAPP). Nevertheless, because the CAPP problem is complex and is characterized by many interdependent technical and business parameters and variables, no viable off-the-shelf solution is yet available that can be easily or widely implemented in industry. This paper presents an overview of the CAPP field and describes a holistic component manufacturing process planning model based on an integrated approach combining technological and business considerations. The model was derived based on available literature, an overview of the state-of-the-art in Digital Manufacturing, Product Lifecycle Management (PLM) and CAPP solution providers, and a survey of Small Medium Enterprise (SME) manufacturers. This model will form the basis for developing improved decision support and knowledge management capabilities to enhance available CAPP solutions.
引用
收藏
页码:175 / 180
页数:6
相关论文
共 15 条
[1]  
BERCHTOLD S, 1997, S3 SIMILARITY SEARCH
[2]  
Boer C. R., 1990, CIRP ANN-MANUF TECHN, V39, P481, DOI DOI 10.1016/S0007-8506(07)61101-9
[3]  
CHANG TC, 1999, TOOLS MANUFACTURING
[4]   Mapping knowledge about product lifecycle engineering for ontology construction via object-process methodology [J].
Dori, D ;
Shpitalni, M .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2005, 54 (01) :117-122
[5]  
Fontana M, 1999, COMPUT GRAPH FORUM, V18, pC107, DOI 10.1111/1467-8659.00332
[6]   A constraint-based operation sequencing for a knowledge-based process planning [J].
Göloglu, C .
JOURNAL OF INTELLIGENT MANUFACTURING, 2004, 15 (04) :463-470
[7]  
GOMEZPEREZ A, 1998, HDB APPL EXPERT SYST
[8]  
Huhns M. N., 1997, IEEE Internet Computing, V1, P81, DOI 10.1109/4236.643942
[9]  
Koenig DT, 1990, COMPUTER INTEGRATED
[10]   Resource-aware aggregate planning for the distributed manufacturing enterprise [J].
Maropoulos, PG ;
McKay, KR ;
Bramall, DG .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2002, 51 (01) :363-366