Robust reliability of projects with activity-duration uncertainty

被引:21
作者
Ben-Haim, Y [1 ]
Laufer, A [1 ]
机构
[1] Technion Israel Inst Technol, Fac Mech Engn, IL-32000 Haifa, Israel
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1998年 / 124卷 / 02期
关键词
D O I
10.1061/(ASCE)0733-9364(1998)124:2(125)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Today's projects suffer from high uncertainty, great demand for accelerated speed, and severe scarcity of attention of the project manager. At the same time, the schedules of today's projects are expected to be more reliable than ever. This paper presents a new concept for improving the reliability of a project schedule suffering from uncertainty in the duration of its activities. The paper shows that the technique for applying the new concept requires minimal information, incorporates subjective information, is simple to use, and assists in the preparation of project schedules at a desirable level of reliability. Specific examples demonstrate the use of the technique for: (1) calculating the reliability of the project schedule; (2) enhancing the reliability of the project schedule; (3) reducing project duration without diminishing its reliability; and (4) examining how overlapping of project activities affects its reliability.
引用
收藏
页码:125 / 132
页数:8
相关论文
共 29 条
[1]  
[Anonymous], 1990, RES TECHNOL MANAGE
[2]  
Ben-Haim Y., 1990, CONVEX MODELS UNCERT
[3]  
Ben-Haim Y., 1994, Erkenntnis, V41, P139, DOI DOI 10.1007/BF01128824
[4]  
BenHaim Y, 1997, ADV APPL MECH, V33, P1, DOI 10.1016/S0065-2156(08)70384-3
[5]  
BENHAIM Y, 1985, ASSAY SAPTIALLY RAND
[6]  
BENHAIM Y, 1996, ROBUST RELIABILITY M
[7]  
COUILLARD J, 1995, PROJ MGMT J, V22, P3
[8]  
DINSMORE PC, 1982, P PROJ MGMT I TORO J, V4, P1
[9]  
Frizelle G. D. M., 1993, International Journal of Project Management, V11, P39, DOI 10.1016/0263-7863(93)90008-B
[10]  
Gong D., 1993, International Journal of Project Management, V11, P165, DOI 10.1016/0263-7863(93)90049-S