MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs

被引:43
作者
Absi, Nabil
Kedad-Sidhoum, Safia
机构
[1] Lab LIP6, F-75252 Paris 05, France
[2] Dynasys SA, F-67300 Schiltigheim, France
关键词
lot-sizing; setup time; shortage cost; safety stock de. cit; production planning; mixed integer programming; heuristic;
D O I
10.1051/ro:2007014
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We address a multi-item capacitated lot-sizing problem with setup times that arises in real-world production planning contexts. Demand cannot be backlogged, but can be totally or partially lost. Safety stock is an objective to reach rather than an industrial constraint to respect. The problem is NP-hard. We propose mixed integer programming heuristics based on a planning horizon decomposition strategy to find a feasible solution. The planning horizon is partitioned into several sub-horizons over which a freezing or a relaxation strategy is applied. Some experimental results showing the effectiveness of the approach on real-world instances are presented. A sensitivity analysis on the parameters of the heuristics is reported.
引用
收藏
页码:171 / 192
页数:22
相关论文
共 25 条
[1]  
ABSI N, MULTIITEM CAPACITATE
[2]  
ABSI N, 2005, THESIS U P M CURIE P
[3]   The single-item lot-sizing problem with immediate lost sales [J].
Aksen, D ;
Altinkemer, K ;
Chand, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 147 (03) :558-566
[4]   bc-prod:: A specialized branch-and-cut system for lot-sizing problems [J].
Belvaux, G ;
Wolsey, LA .
MANAGEMENT SCIENCE, 2000, 46 (05) :724-738
[5]   COMPUTATIONAL-COMPLEXITY OF THE CAPACITATED LOT SIZE PROBLEM [J].
BITRAN, GR ;
YANASSE, HH .
MANAGEMENT SCIENCE, 1982, 28 (10) :1174-1186
[6]   Single item lot sizing problems [J].
Brahimi, N ;
Dauzere-Peres, S ;
Najid, NM ;
Nordli, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (01) :1-16
[7]  
Chen W.-H., 1990, Annals of Operations Research, V26, P29, DOI 10.1007/BF02248584
[8]   Hybrid heuristics for planning lot setups and sizes [J].
Clark, AR .
COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 45 (04) :545-562
[9]   CAPACITATED LOT-SIZING AND SCHEDULING BY LAGRANGEAN RELAXATION [J].
DIABY, M ;
BAHL, HC ;
KARWAN, MH ;
ZIONTS, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 59 (03) :444-458
[10]  
EVANS JR, 1982, J OPER MANAG, V5, P229