Impacts of inventory shortage policies on transportation requirements in two-stage distribution systems

被引:13
作者
Geunes, J
Zeng, AZ
机构
[1] Univ Florida, Dept Ind & Syst Engn, Gainesville, FL 32611 USA
[2] Worcester Polytech Inst, Dept Management, Worcester, MA 01609 USA
关键词
distribution; logistics; supply chain management;
D O I
10.1016/S0377-2217(00)00227-7
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper investigates the impacts inventory shortage policies have on transportation costs in base-stock distribution systems under uncertain demand. The model proposed demonstrates how backlogging arrangements can serve to decrease the variability of transportation capacity requirements, and hence the magnitude of transportation costs, when compared with policies that expedite demand shortages. The model shows how inventory policy decisions directly impact expected transportation costs and provides a new method for setting stock levels that jointly minimizes inventory and transportation costs. The model and solution method provide insights into the relationship between inventory decisions and transportation costs and can serve to support delivery policy negotiations between a supplier and customer that must choose between expediting and backlogging demand shortages. (C) 2001 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:299 / 310
页数:12
相关论文
共 10 条
[1]  
Bazaraa M.S., 2013, Nonlinear Programming-Theory and Algorithms, V3rd
[2]  
DAGANZO CF, 1991, LOGISTICS SYSTEMS
[3]  
ERNST R, 1993, NAV RES LOG, V40, P879, DOI 10.1002/1520-6750(199312)40:7<879::AID-NAV3220400703>3.0.CO
[4]  
2-0
[5]  
Hadley G., 1963, ANAL INVENTORY SYSTE
[6]   An inventory model embedded in designing a supply contract [J].
Henig, M ;
Gerchak, Y ;
Ernst, R ;
Pyke, DF .
MANAGEMENT SCIENCE, 1997, 43 (02) :184-189
[7]  
NAHMIAS S, 1997, PROD OPERATIONS ANAL
[8]   An integrated inventory-transportation system with modified periodic policy for multiple products [J].
Qu, WW ;
Bookbinder, JH ;
Iyogun, P .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 115 (02) :254-269
[9]  
Yano C. A., 1989, Journal of Manufacturing and Operations Management, V2, P314
[10]   OPTIMIZING TRANSPORTATION CONTRACTS TO SUPPORT JUST-IN-TIME DELIVERIES - THE CASE OF ONE CONTRACTED TRUCK PER SHIPMENT [J].
YANO, CA .
IIE TRANSACTIONS, 1992, 24 (02) :177-183