共 5 条
[1]
Chavan AM, 1998, ASTR SOC P, V145, P255
[2]
Giuliano M, 1998, ASTR SOC P, V145, P271
[3]
Hendrikson C., 1989, PROJECT MANAGEMENT C
[4]
Pinedo M., 1995, Scheduling: Theory, Algorithms, and Systems, V2nd
[5]
Observation scheduling scheme for Subaru telescope
[J].
ADVANCED TELESCOPE AND INSTRUMENTATION CONTROL SOFTWARE,
2000, 4009
:350-354