Organizing for an initial implementation of S88

被引:4
作者
Nelson, PR [1 ]
Shull, RS [1 ]
机构
[1] Dow Corning Corp, Adv Engn Mat, Midland, MI 48686 USA
关键词
automation benefits; batch control; documentation; process control systems;
D O I
10.1016/S0019-0578(97)00013-X
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Three steps to a better implementation of the new Batch Control Standard S88. The authors present an outline for implementing S88 based on their experience re-engineering a batch-intensive silicone manufacturing facility. The three outlined steps include: Laying an educational, organizational and technical foundation (Section 2); creating and documenting the plan (Section 3); and learning from implementation (Section 4). Section 2 focuses on project scope and business drivers, establishing a philosophy of automation, the use of standards, and creation of a skill-based organization. Section 3 focuses on the interrelationship of the "Three Models" of S88 (procedural, physical, and process). Section 4 includes observations from implementation. (C) 1997 Elsevier Science Ltd.
引用
收藏
页码:189 / 195
页数:7
相关论文
共 6 条
[1]  
Coad P, OBJECT ORIENTED ANAL
[2]  
Coad P., OBJECT ORIENTED DESI
[3]  
FISHER TG, 1990, DESIGN APPL IMPLEMEN
[4]  
*ISA, 1995, BATCH CONTROL 1
[5]  
SHLAER S, OBJECT LIFECYCLES
[6]  
*WORLD BATCH FOR E, 1995, SP88 BATCH AUT PROC, V1