Thermo-fluids provisioning of a high performance high density data center

被引:60
作者
Beitelmal, Abdlmonem H. [1 ]
Patel, Chandrakant D. [1 ]
机构
[1] Hewlett Packard Labs, Palo Alto, CA 94304 USA
关键词
data center; smart cooling; load migration; cooling of data center; provisioning of data centers; heat; cooling; exergy; transient analysis of data center; CFD analysis of data center; computer room cooling;
D O I
10.1007/s10619-005-0413-0
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Consolidation and dense aggregation of slim compute, storage and networking hardware has resulted in high power density data centers. The high power density resulting from current and future generations of servers necessitates detailed thermo-fluids analysis to provision the cooling resources in a given data center for reliable operation. The analysis must also predict the impact on the thermo-fluid distribution due to changes in hardware configuration and building infrastructure such as a sudden failure in data center cooling resources. The objective of the analysis is to assure availability of adequate cooling resources to match the heat load, which is typically non-uniformly distributed and characterized by high-localized power density. This study presents an analysis of an example modern data center with a view of the magnitude of temperature variation and impact of a failure. Initially, static provisioning for a given distribution of heat loads and cooling resources is achieved to produce a reference state. A perturbation in reference state is introduced to simulate a very plausible scenario-failure of a computer room air conditioning (CRAC) unit. The transient model shows the "redlining" of inlet temperature of systems in the area that is most influenced by the failed CRAC. In this example high-density data center, the time to reach unacceptable inlet temperature is less than 80 seconds based on an example temperature set point limit of 40 degrees C (most of today's servers would require an inlet temperature below 35 degrees C to operate). An effective approach to resolve this issue, if there is adequate capacity, is to migrate the compute workload to other available systems within the data center to reduce the inlet temperature to the servers to an acceptable level.
引用
收藏
页码:227 / 238
页数:12
相关论文
共 8 条
[1]  
BASH CE, 2003, INT J HEAT VENTILATI
[2]  
GRAUPNER S, 2004, 4 IEEE ACM INT S CLU
[3]  
PATEL CD, 2002, ITHERM 2002 8 INT C
[4]  
PATEL CD, 2003 INT MECH ENG C
[5]  
PATEL CD, 2001, P IPACK 01 PAC RIM A
[6]  
PATEL CD, 2003, P IPACK 03 PAC RIM A
[7]  
SHARMA R, 2002, AM I AER ASTR C ST L
[8]  
SHARMA R, HPL20035