Key factors in bid reasoning model

被引:129
作者
Chua, DKH [1 ]
Li, D [1 ]
机构
[1] Natl Univ Singapore, Dept Civil Engn, Singapore 119260, Singapore
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2000年 / 126卷 / 05期
关键词
D O I
10.1061/(ASCE)0733-9364(2000)126:5(349)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The bidding decision is a complex problem affected by numerous factors. The current study collected a list of determining factors from the results of past research and opinions of six experienced practitioners in competitive bidding. Based on these factors, a bid reasoning model was established to go deeply into the bid decision process. Differing from other earlier work, this model-oriented study focuses on the effects of the determining factors on four reasoning subgoals: competition, risk, company's position in bidding, and need for work. Their different contributions to each reasoning subgoal were reviewed under three main construction procurement methods, namely, unit rate contract, lump sum contract, and design/build contract. The Analytic Hierarchy Process technique was applied in this study. A survey questionnaire was developed with four hierarchies being formulated respectively for the four reasoning subgoals. The survey was conducted in two steps, the pilot survey among the six experienced practitioners and the subsequent one among 153 top contractors in Singapore. From this survey, a set of top key factors and their relative importance weights were identified. This result together with the bid reasoning model can serve as the framework for the further development of the bid decision support system.
引用
收藏
页码:349 / 357
页数:9
相关论文
共 19 条
[1]   DECISION-SUPPORT SYSTEM FOR MODELING BID NO-BID DECISION PROBLEM [J].
AHMAD, I .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (04) :595-608
[2]  
Ahmad I., 1988, J MANAGE ENG, V4, P229, DOI DOI 10.1061/(ASCE)9742-597X(1988)4:3(229)
[3]   Factors affecting contractors' risk of cost overburden [J].
Akinci, B ;
Fischer, M .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1998, 14 (01) :67-76
[4]  
[Anonymous], 2020, AMERICAVILLE
[5]  
[Anonymous], 1980, ANAL HIERARCHY PROCE
[6]   Critical success factors for different project objectives [J].
Chua, DKH ;
Kog, YC ;
Loh, PK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (03) :142-150
[7]   Utility-theory model for markup decisions [J].
Dozzi, SP ;
AbouRizk, SM ;
Schroeder, SL .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (02) :119-124
[8]  
*EXP CHOIC INC, 1996, EXP CHOIC WIND US MA
[9]   A COMPETITIVE-BIDDING STRATEGY [J].
FRIEDMAN, L .
OPERATIONS RESEARCH, 1956, 4 (01) :104-112
[10]  
Gates M., 1967, J CONSTRUCTION DIVIS, V93, P75, DOI DOI 10.1061/JCCEAZ.0000192