Optimization of telescope scheduling -: Algorithmic research and scientific policy

被引:21
作者
de Castro, AIG [1 ]
Yáñez, J
机构
[1] Univ Complutense Madrid, CSIC, Inst Astron & Geodesia, E-28040 Madrid, Spain
[2] Univ Complutense Madrid, Dept Stat & Operat Res, E-28040 Madrid, Spain
关键词
methods; observational;
D O I
10.1051/0004-6361:20030319
中图分类号
P1 [天文学];
学科分类号
0704 ;
摘要
The use of very expensive facilities in Modern Astronomy has demonstrated the importance of automatic modes in the operation of large telescopes. As a consequence, several mathematical tools have been applied and developed to solve the (NP - hard) scheduling optimization problem: from simple heuristics to the more complex genetic algorithms or neural networks. In this work, the basic scheduling problem is translated into mathematical language and two main methods are used to solve it: neighborhood search methods and genetic algorithms; both of them are analysed. It is shown that the algorithms are sensitive to the scientific policy by means of the definition of the objective function ( F) and also by the assignment of scientific priorities to the projects. The definition of F is not trivial and requires a detailed discussion among the Astronomical Community.
引用
收藏
页码:357 / 367
页数:11
相关论文
共 14 条
[1]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[2]  
BALL MO, 1995, HDB OPERATIONS RES M, V7
[3]   A continuous genetic algorithm designed for the global optimization of multimodal functions [J].
Chelouah, R ;
Siarry, P .
JOURNAL OF HEURISTICS, 2000, 6 (02) :191-213
[4]  
Dasgupta D., 1997, EVOLUTIONARY ALGORIT
[5]  
DRUMMOND M, 1994, P I SATRAS 94
[6]  
FORD J, 1998, REP SPIES INT S ASTR
[7]  
GIONNONE G, 2000, ASP C SER, V216, P111
[8]  
HOLLAND JH, 1975, ADAPTATION NATURAL A
[9]  
Johnston M. D., 1994, INTELLIGENT SCHEDULI, P391
[10]   SCHEDULING WITH NEURAL NETWORKS - THE CASE OF THE HUBBLE SPACE TELESCOPE [J].
JOHNSTON, MD ;
ADORF, HM .
COMPUTERS & OPERATIONS RESEARCH, 1992, 19 (3-4) :209-240