Large Consumer Electricity Acquisition Considering Time-of-Use Rates Demand Response Programs

被引:42
作者
Nojavan, Sayyad [1 ]
Qesmati, Hadi [1 ]
Zare, Kazem [1 ]
Seyyedi, Heresh [1 ]
机构
[1] Univ Tabriz, Tabriz, Iran
关键词
Demand response programs (DRP); Stochastic energyprocurement; Large consumer; Time-of-use (TOU) program; DISTRIBUTED GENERATION; PROCUREMENT; LOAD; PLACEMENT; RISK;
D O I
10.1007/s13369-014-1430-y
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
070301 [无机化学]; 070403 [天体物理学]; 070507 [自然资源与国土空间规划学]; 090105 [作物生产系统与生态工程];
摘要
The consumers try to obtain their electricity demand at minimum cost from different resources in restructured electricity markets. Hence more attention have been made on demand response programs (DRP) which aims to electricity price reduction, transmission lines congestion solution, security intensification and improvement of market liquidity and customer load benefit. This paper develops a stochastic energy procurement model for large consumer with multiple options including distributed generations, bilateral contracts and pool market purchase considering DRP. Pool market price uncertainty is modeled based on scenario distribution curve approach such as normal distribution curve. The curve is divided into several areas, each area identified as a scenario, and the problem is solved using stochastic programming. Also, this paper is focused to study the effect of DRP on total expected procurement cost has been discussed in all scenarios. Actually a new stochastic framework using demand response program is presented for large consumer expected procurement cost reduction.
引用
收藏
页码:8913 / 8923
页数:11
相关论文
共 36 条
[1]
Modeling and prioritizing demand response programs in power markets [J].
Aalami, H. A. ;
Moghaddam, M. Parsa ;
Yousefi, G. R. .
ELECTRIC POWER SYSTEMS RESEARCH, 2010, 80 (04) :426-435
[2]
A demand response based solution for LMP management in power markets [J].
Aazami, Rahmat ;
Aflaki, Kaveh ;
Haghifam, Mahmoud Reza .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2011, 33 (05) :1125-1132
[3]
A summary of demand response in electricity markets [J].
Albadi, M. H. ;
El-Saadany, E. F. .
ELECTRIC POWER SYSTEMS RESEARCH, 2008, 78 (11) :1989-1996
[4]
Bloustein E., 2005, School of Planning and Public Policy
[5]
Brooke Anthony., 1998, A User's Guide
[6]
Canadian Electricity Association, 2010, SMART GRID PRAGM APP
[7]
Charles River Associates, D06090 CRA WORLD BAN
[8]
Risk-constrained electricity procurement for a large consumer [J].
Conejo, A. J. ;
Carrin, M. .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2006, 153 (04) :407-413
[9]
Energy procurement for large consumers in electricity markets [J].
Conejo, AJ ;
Fernández-González, JJ ;
Alguacil, N .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2005, 152 (03) :357-364
[10]
OPTIMAL DEMAND-SIDE RESPONSE TO ELECTRICITY SPOT PRICES FOR STORAGE-TYPE CUSTOMERS [J].
DARYANIAN, B ;
BOHN, RE ;
TABORS, RD .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1989, 4 (03) :897-903