Scheduling optimization under uncertainty - an alternative approach

被引:85
作者
Balasubramanian, J [1 ]
Grossmann, IE [1 ]
机构
[1] Carnegie Mellon Univ, Dept Chem Engn, Pittsburgh, PA 15213 USA
基金
美国国家科学基金会;
关键词
scheduling; uncertainty; fuzzy numbers; MILP models; tabu search; flowshop plants; new product development;
D O I
10.1016/S0098-1354(02)00221-1
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The prevalent approach to the treatment of processing time uncertainties in production scheduling problems is through the use of probabilistic models. Apart from requiring detailed information about probability distribution functions, this approach also has the drawback that the computational expense of solving these models is very high. In this work, we present a non-probabilistic treatment of scheduling optimization under uncertainty, where we describe the imprecision and uncertainty in the task durations using concepts from fuzzy set theory. We first provide a brief review on the fuzzy set approach, comparing it with the probabilistic approach. We then present mixed integer linear programming (MILP) models derived from applying this approach to two different problems-flowshop scheduling and new product development process scheduling-and show how they can be used to predict most likely, optimistic and pessimistic values of metrics such as the makespan. Results indicate that these MILP models are computationally tractable for reasonably sized problems. We also describe tabu search implementations in order to handle larger problems. (C) 2002 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:469 / 490
页数:22
相关论文
共 48 条
[1]  
Aarts E., 1989, Wiley-Interscience Series in Discrete Mathematics and Optimization
[2]  
[Anonymous], SCHEDULING FUZZINESS
[3]  
[Anonymous], 1970, MANAGE SCI, DOI [10.1287/mnsc.16.10.b630, DOI 10.1287/MNSC.16.10.B630]
[4]  
Arnold K., 1998, JAVA PROGRAMMING LAN
[5]   A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times [J].
Balasubramanian, J ;
Grossmann, IE .
COMPUTERS & CHEMICAL ENGINEERING, 2002, 26 (01) :41-57
[6]  
Battiti R., 1994, ORSA Journal on Computing, V6, P126, DOI 10.1287/ijoc.6.2.126
[7]   EFFICIENT OPTIMIZATION ALGORITHMS FOR ZERO-WAIT SCHEDULING OF MULTIPRODUCT BATCH PLANTS [J].
BIREWAR, DB ;
GROSSMANN, IE .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1989, 28 (09) :1333-1345
[8]   THE USE OF FUZZY VARIABLES IN PERT [J].
CHANAS, S ;
KAMBUROWSKI, J .
FUZZY SETS AND SYSTEMS, 1981, 5 (01) :11-19
[9]  
CHEN SJ, 1992, FUZZY MULTIPLE ATTRI, P1992
[10]   THE MEAN-VALUE OF A FUZZY NUMBER [J].
DUBOIS, D ;
PRADE, H .
FUZZY SETS AND SYSTEMS, 1987, 24 (03) :279-300