Justification and RCPSP:: A technique that pays

被引:169
作者
Valls, V
Ballestín, F
Quintanilla, S
机构
[1] Univ Valencia, Fac Matemat, Dept Estadist & Invest Operat, Valencia 46100, Spain
[2] Univ Valencia, Fac Econ & Empresariales, Dept Econ Financiera & Matemat, Valencia 46100, Spain
关键词
resource-constrained project scheduling; justification; heuristic algorithms;
D O I
10.1016/j.ejor.2004.04.008
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The objective of this paper is to show that justification is a simple technique that can be easily incorporated in diverse algorithms for the resource-constrained project scheduling problem-imp roving the quality of the schedules generated without generally requiring more computing time. The results of incorporating this technique in 22 different algorithms are shown. Fifteen of the new algorithms that use double justification outperform seven of the best heuristic algorithms that do not use justification. The tests have been performed on the standard test set j120 for the RCPSP generated using ProGen. (c) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:375 / 386
页数:12
相关论文
共 35 条
[1]   A robust genetic algorithm for resource allocation in project scheduling [J].
Alcaraz, J ;
Maroto, C .
ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) :83-109
[2]  
[Anonymous], CENTRAL EUROPEAN J O
[3]  
BALLESTIN F, 2001, THESIS U VALENCIA SP
[4]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[5]   A branch and bound algorithm for the resource-constrained project scheduling problem [J].
Brucker, P ;
Knust, S ;
Schoo, A ;
Thiele, O .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) :272-288
[6]   Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41
[7]   A BRANCH-AND-BOUND PROCEDURE FOR THE MULTIPLE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM [J].
DEMEULEMEESTER, E ;
HERROELEN, W .
MANAGEMENT SCIENCE, 1992, 38 (12) :1803-1818
[8]   A branch-and-bound algorithm for the resource-constrained project scheduling problem [J].
Dorndorf, U ;
Pesch, E ;
Phan-Huy, T .
MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2000, 52 (03) :413-439
[9]   SCHEDULING OF PROJECT NETWORKS BY JOB ASSIGNMENT [J].
DREXL, A .
MANAGEMENT SCIENCE, 1991, 37 (12) :1590-1602
[10]   A self-adapting genetic algorithm for project scheduling under resource constraints [J].
Hartmann, S .
NAVAL RESEARCH LOGISTICS, 2002, 49 (05) :433-448