RIMAP demonstration project. Risk-based life management of piping system in power plant Heilbronn

被引:13
作者
Bareiss, J
Buck, P
Matschecko, B
Jovanovic, A
Balos, D
Perunicic, M
机构
[1] EnBW Energy Solut GmbH, D-70174 Stuttgart, Germany
[2] EnBW, Heilbronn, Germany
[3] MPA, Stuttgart, Germany
关键词
risk-based life management; risk-based maintenance; inspection plan; probability of failure;
D O I
10.1016/j.ijpvp.2004.07.004
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
in the framework of EU project RIMAP [Risk Based Inspection and Maintenance Procedures for European Industry (2000)] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM, Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects development (RTD) demonstration (DEMO) thematic network (TN) Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper identification of critical components application of a multilevel risk analysis (... from 'screening' to 'detailed analysis') determination of PoF (Probability of Failure) determination of CoF (Consequence of Failure) optimation of inspection and maintenance plan From our experience with the application of the RIMAP methodology the following conclusions can be drawn: The use of risk-based methods in inspection and maintenance of piping systems in power plants gives transparency to the decision making process and gives an optimized maintenance policy based on current state of the components. The results of the work clearly show the power of the proposed method for concentration on critical items: out of 64 monitored components 5 were selected for intermediate analysis and only I for the detailed analysis (probabilistic high temperature fracture mechanics). (C) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:807 / 813
页数:7
相关论文
共 8 条
[1]  
BAREISS JM, 2002, RIMAP C MARCH 2002 R
[2]  
BAREISS JM, 2003, FRAUNH IPA SEM NEUEN
[3]  
Jovanovic A. S., 2002, RIMAP D4 DELIVERABLE
[4]  
JOVANOVIC AS, 2002, RIMPA D2 1 DELIVERAB
[5]  
JOVANOVIC AS, 2002, RIMAP D2 1 DELIVERAB
[6]  
JOVANOVIC AS, 2002, RIMAP D3 DELIVERABLE
[7]  
*RIMAP, 2000, G1RDCT200103008 RIMA, P4
[8]  
1979, TECHNICAL RULES STEA