A two-level advanced production planning and scheduling model for RFID-enabled ubiquitous manufacturing

被引:95
作者
Zhong, Ray Y. [1 ,2 ]
Huang, George Q. [1 ]
Lan, Shulin [1 ]
Dai, Q. Y. [3 ]
Zhang, T. [4 ]
Xu, Chen [5 ]
机构
[1] Univ Hong Kong, Dept Ind & Mfg Syst Engn, HKU ZIRI Lab Phys Internet, Hong Kong, Hong Kong, Peoples R China
[2] Shenzhen Univ, Coll Informat Engn, Shenzhen, Peoples R China
[3] Guangdong Polytech Normal Univ, Guangzhou, Guangdong, Peoples R China
[4] Huaiji Dengyun Autoparts Holding Co Ltd, Zhaoqing, Guangdong, Peoples R China
[5] Shenzhen Univ, Inst Intelligent Comp Sci, Shenzhen, Peoples R China
基金
中国国家自然科学基金;
关键词
Advanced production planning and scheduling (APPS); Radio frequency identification (RFID); Real-time; Ubiquitous manufacturing; Two-level; Shop floor; PRODUCTION DECISION-MAKING; EXECUTION SYSTEM; HYBRID FLOWSHOPS; MANAGEMENT; ALGORITHM; RULES; TIMES; SHOP;
D O I
10.1016/j.aei.2015.01.002
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Radio frequency identification (RFID) technology has been used in manufacturing industries to create a RFID-enabled ubiquitous environment, in where ultimate real-time advanced production planning and scheduling (APPS) will be achieved with the goal of collective intelligence. A particular focus has been placed upon using the vast amount of RFID production shop floor data to obtain more precise and reasonable estimates of APPS parameters such as the arrival of customer orders and standard operation times (SOTs). The resulting APPS model is based on hierarchical production decision-making principle to formulate planning and scheduling levels. A RFID-event driven mechanism is adopted to integrate these two levels for collective intelligence. A heuristic approach using a set of rules is utilized to solve the problem. The model is tested through four dimensions, including the impact of rule sequences on decisions, evaluation of released strategy to control the amount of production order from planning to scheduling, comparison with another model and practical operations, as well as model robustness. Two key findings are observed. First, release strategy based on the RFID-enabled real-time information is efficient and effective to reduce the total tardiness by 44.46% averagely. Second, it is observed that the model has the immune ability on disturbances like defects. However, as the increasing of the problem size, the model robustness against emergency orders becomes weak; while, the resistance to machine breakdown is strong oppositely. Findings and observations are summarized into a number of managerial implications for guiding associated end-users for purchasing collective intelligence in practice. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:799 / 812
页数:14
相关论文
共 43 条
[1]   A multi-agent RFID-enabled distributed control system for a flexible manufacturing shop [J].
Barenji, Reza Vatankhah ;
Barenji, Ali Vatankhah ;
Hashemipour, Majid .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 71 (9-12) :1773-1791
[2]   A genetic algorithm for dynamic advanced planning and scheduling (DAPS) with a frozen interval [J].
Chen, K. J. ;
Ji, P. .
EXPERT SYSTEMS WITH APPLICATIONS, 2007, 33 (04) :1004-1010
[3]  
Chen YC, 2013, INT J INFORM TECHNOL, V12, P85
[4]   N* - an agent-based negotiation algorithm for dynamic scheduling and rescheduling [J].
Chun, HW ;
Wong, RYM .
ADVANCED ENGINEERING INFORMATICS, 2003, 17 (01) :1-22
[5]   Radio frequency identification-enabled real-time manufacturing execution system: a case study in an automotive part manufacturer [J].
Dai, Qingyun ;
Zhong, Runyang ;
Huang, George Q. ;
Qu, Ting ;
Zhang, T. ;
Luo, T. Y. .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2012, 25 (01) :51-65
[6]   Advanced planning and scheduling systems in aluminium conversion industry [J].
David, F. ;
Pierreval, H. ;
Caux, C. .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2006, 19 (07) :705-715
[7]   Event-driven multi-agent ubiquitous manufacturing execution platform for shop floor work-in-progress management [J].
Fang, Ji ;
Huang, George Q. ;
Li, Zhi .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (04) :1168-1185
[8]  
Guo Z., 2014, INT J PROD EC
[9]   Flowshop scheduling research after five decades [J].
Gupta, JND ;
Stafford, EF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 169 (03) :699-711
[10]  
Haight F. A., 1967, Handbook of the poisson distribution