Comparison of control strategies for nitrogen remova in an activated sludge process in terms of operating costs: A simulation study

被引:148
作者
Stare, A. [1 ]
Vrecko, D. [1 ]
Hvala, N. [1 ]
Strmcnik, S. [1 ]
机构
[1] Jozef Stefan Inst, Dept Syst & Control, Ljubljana 1000, Slovenia
关键词
activated sludge process; wastewater treatment benchmark; nitrogen removal; control;
D O I
10.1016/j.watres.2007.01.029
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this paper several control strategies for nitrogen removal are proposed and evaluated in a benchmark simulation model of an activated sludge process. The goal is to determine which control strategy delivers better performance with respect to plant operating costs. In the study, constant manipulated variables and various PI and feedforward control strategies are tested and compared with predictive control, which uses an ideal process model. The control strategies differ in the information used about the process (number of sensors and sensor location) and in the complexity of the control algorithms. To determine the set-points that yield optimal operating costs, an operational map is constructed for each control strategy. Results of the simulation show that with PI and feedforward controllers almost the same optimal operating costs can be achieved as with more advanced MPC algorithms under various plant operating conditions. More advanced control algorithms are advantageous only in cases where the plant is highly loaded and if stringent effluent fines are imposed by legislation. (c) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2004 / 2014
页数:11
相关论文
共 16 条
[1]  
[Anonymous], THESIS UPPSALA U SWE
[2]   Supervisory control strategies for the new WWTP of Galindo-Bilbao: the long run from the conceptual design to the full-scale experimental validation [J].
Ayesa, E ;
De la Sota, A ;
Grau, P ;
Sagarna, JM ;
Salterain, A ;
Suescun, J .
WATER SCIENCE AND TECHNOLOGY, 2006, 53 (4-5) :193-201
[3]  
Carstensen J, 1994, THESIS TU DENMARK
[4]  
Copp B., 2002, The COST Simulation Benchmark-Description and Simulator Manual
[5]  
Henze M., 2000, SCI TECHNICAL REPORT
[6]  
Ingildsen P, 2002, THESIS LUND U SWEDEN
[7]  
JEPSSON U, 2005, AERATION MIXING ENER
[8]   Optimised operation and design of alternating activated sludge processes for N-removal [J].
Lukasse, LJS ;
Keesman, KJ .
WATER RESEARCH, 1999, 33 (11) :2651-2659
[9]  
Maciejowski J. M., 2002, Predictive control: with constraints
[10]  
Olsson G., 1999, WASTEWATER TREATMENT