Performance and economic of the thermal energy storage systems to enhance the peaking capacity of the cas turbines

被引:38
作者
Ameri, M [1 ]
Hejazi, SH [1 ]
Montaser, K [1 ]
机构
[1] Power & Water Univ Technol, Power Plant Engn Dept, Combined Heat & Power Specialized Unit, Tehran, Iran
关键词
Kish power plant; inlet air cooling; gas turbine; thermal energy storage; power augmentation;
D O I
10.1016/j.applthermaleng.2004.05.012
中图分类号
O414.1 [热力学];
学科分类号
摘要
There are many gas turbines in Iran favored for coping with the peak electricity demand of the utilities due to their specific properties. However, due to the high ambient temperature In the hot seasons, air mass flow, power output and efficiency of gas turbines decrease considerably. To solve this problem, the inlet air to the gas turbines should be cooled. This paper presents an overview of using the thermal energy storage for combustion turbine inlet air-cooling (TESTIAC) to increase the peaking capacity of it. Several cases of the chilled water and ice storage systems have been studied for the capacity enhancement in Kish Power plant. The best case has been selected by economical studies. This study shows that the combustion turbine capacity enhancement will be around 13.6% by using this method. The internal rate of return will be 27.3%. The cost of electricity (COE) is calculated to be 5.36 Cents/kWh which is less than the current price of electricity in Iran on-peak hours. (C) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:241 / 251
页数:11
相关论文
共 8 条
  • [1] ANDREPORT JS, 2001, ASHRAE J, V97, P892
  • [2] *ASHRAE, 1996, ASHRAE T ATL GEORG
  • [3] BABCOCK, 1994, ICE THERMAL ENERGY S
  • [4] BROWN DR, 2000, THERMAL ENERGY STORA
  • [5] HALL AD, 1994, ASHRAE J, V100, P596
  • [6] MONTASER K, 2002, THESIS POWER WATER U
  • [7] Omidvar B., 2001, 3 ANN AUSTR GAS TURB
  • [8] STEWART WE, 1999, ASHRAE J