Subsidy to nuclear power through Price-Anderson liability limit: Comment

被引:9
作者
Heyes, AG [1 ]
Liston-Heyes, C
机构
[1] Univ London, London WC1E 7HU, England
[2] Univ London Royal Holloway & Bedford New Coll, Sch Management, Egham TW20 0EX, Surrey, England
关键词
D O I
10.1111/j.1465-7287.1998.tb00506.x
中图分类号
F [经济];
学科分类号
02 ;
摘要
Dubin and Rothwell (1990) use details of insurance premiums to develop a methodology for inferring the value to nuclear operators of the Price-Anderson liability limit from bur misinterpret the terms of the insurance contracts for which the premiums are paid. This leads them to overstate the subsidy due to the limit by a factor of between four and ten.
引用
收藏
页码:122 / 124
页数:3
相关论文
共 2 条
[1]  
DUBIN JA, 1990, CONT POLICY ISSUES, P73
[2]  
LAING CE, 1992, REV ASSESSMENT PUBLI