Valuing flexible operation of power plants with CO2 capture

被引:64
作者
Chalmers, Hannah [1 ,2 ]
Leach, Matt [1 ]
Lucquiaud, Mathieu [2 ]
Gibbins, Jon [2 ]
机构
[1] Univ Surrey, Ctr Environm Strategy, Guildford GU2 7XH, Surrey, England
[2] Imperial Coll, Mech Engn Dept, London SW7 2AZ, England
来源
GREENHOUSE GAS CONTROL TECHNOLOGIES 9 | 2009年 / 1卷 / 01期
关键词
power plants; CO2; capture; investment decisions; operating flexibility; options analysis; PERFORMANCE; STORAGE;
D O I
10.1016/j.egypro.2009.02.241
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
080707 [能源环境工程]; 082001 [油气井工程];
摘要
The business case for investment in power plants with CO2 capture is greatly improved if they are able to accommodate uncertainty in future market conditions and variations in local operating requirements.. This paper will outline a range of operating modes that could be important in determining the value of power plants with CO2 capture from various stakeholder perspectives. Different quantitative techniques that could provide useful insights into plant value with flexible operation are discussed and some preliminary baseline results from a deterministic simulation are reported. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:4289 / 4296
页数:8
相关论文
共 26 条
[1]
Modeling of pumped-storage generation in sequential Monte Carlo production simulation [J].
Allan, RN ;
Li, R ;
Elkateb, MM .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1998, 145 (05) :611-615
[2]
Allinson G, 2006, 8 INT C GREENH GAS C
[3]
[Anonymous], 3 INT C CLEAN COAL T
[4]
[Anonymous], 2008, ENERGY TECHNOLOGY PE, DOI DOI 10.1787/9789264041431-EN
[5]
AWERBUCH S, 2003, EET200303 OECDIEA
[6]
CHALMERS H, 2007, 24 ANN PITTSB COAL C
[7]
CHALMERS H, 2008, ASCE J ENV ENG UNPUB
[8]
CHALMERS H, 2008, ENERGY EC UNPUB
[9]
CHALMERS H, 2007, 3 INT C CLEAN COAL T
[10]
Initial evaluation of the impact of post-combustion capture of carbon dioxide on supercritical pulverised coal power plant part load performance [J].
Chalmers, Hannah ;
Gibbins, Jon .
FUEL, 2007, 86 (14) :2109-2123