Solving engine maintenance capacity problems with simulation

被引:14
作者
Gatland, R [1 ]
Yang, E [1 ]
Buxton, K [1 ]
机构
[1] Delta Air Lines Inc, Dept 018, Atlanta, GA 30320 USA
来源
PROCEEDINGS OF THE 1997 WINTER SIMULATION CONFERENCE | 1997年
关键词
D O I
10.1145/268437.268673
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
For many companies the scheduling of job shops proves very difficult. Competing priorities (due dates, potential profit) from multiple customers confronts the plant manager with many tough questions; which product to work next, can this order waft, and what products to produce together to maximize the machine utilization and minimize setups. These sanae situations are all too common for the manager of an engine maintenance facility. Most airlines fly multiple aircraft types with a unique engine type for each aircraft. Engine overhauls are usually within a single facility at the airline's main hub. With so many different parts and repair routings, a job shop environment is common for an engine maintenance facility. This pal?er will provide an overview of san engine maintenance system, clearly define the capacity planning problem, and describe the goal and scope of the simulation model and its applicability. We model development, experiments, results, and future direction will also be discussed.
引用
收藏
页码:892 / 899
页数:8
相关论文
empty
未找到相关数据