Risk-based maintenance (RBM): A new approach for process plant inspection and maintenance

被引:62
作者
Khan, FI [1 ]
Haddara, M [1 ]
机构
[1] Mem Univ Newfoundland, Fac Engn & Appl Sci, St Johns, NF A1B 3X5, Canada
关键词
maintenance planning; risk; risk-based maintenance; risk assessment; reliability;
D O I
10.1002/prs.10010
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
This paper discusses recently proposed methodology for the design of an optimum maintenance management program. The methodology is based on integrating a reliability approach and a risk assessment strategy to obtain an optimum maintenance schedule. The method is called risk-based maintenance (RBM). First, the likely equipment failure scenarios are formulated. Out of the many likely failure scenarios, the ones that are most credible are subjected to a detailed study. Detailed consequence analysis is done for the selected scenarios. Subsequently, a fault tree analysis is performed to determine the probability of failure. Finally, risk is computed by combining the consequence analysis and the probability analysis results. The calculated risk is compared against known acceptable criteria. The frequency of maintenance tasks is obtained by minimizing the estimated risk. The proposed methodology is used to answer two questions: Which equipment should be included in a scheduled maintenance program? When should the maintenance be scheduled? Offshore oil and gas process facilities involve hazardous chemicals (highly flammable and toxic) at extreme conditions of temperature and pressure. Proper maintenance of process equipment is one of the important activities to ensure safe and continuous operation of the facility. RBM methodology has been used to develop a detailed maintenance plan for safe and fault free operation of the facility. (C) 2004 American Institute of Chemical Engineers Process.
引用
收藏
页码:252 / 265
页数:14
相关论文
共 16 条
[1]   Risk based maintenance optimization: foundational issues [J].
Apeland, S ;
Aven, T .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2000, 67 (03) :285-292
[2]  
*ASME, 2000, HAZ REL PROT
[3]   HAZARDOUS RELEASE PROTECTION - CODE AND STANDARD CONSIDERATIONS FOR PRESSURE SYSTEMS [J].
BROWN, SJ ;
BROWN, TJ .
PROCESS SAFETY PROGRESS, 1995, 14 (04) :244-256
[4]   Risk-based hazardous release protection and prevention by inspection and maintenance [J].
Brown, SJ ;
Le May, I .
JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 2000, 122 (03) :362-367
[5]  
FRANKEL EG, 1998, SYSTEM RELIABILAITY
[6]   A "worst case" methodology for risk assessment of major accident installations [J].
Hirst, IL ;
Carter, DA .
PROCESS SAFETY PROGRESS, 2000, 19 (02) :78-85
[7]  
Khan F., 1998, J LOSS PREVENT PROC, P91
[8]   PROFAT: A user friendly system for probabilistic fault tree analysis [J].
Khan, FI ;
Abbasi, SA .
PROCESS SAFETY PROGRESS, 1999, 18 (01) :42-49
[9]   Analytical simulation and PROFAT II: a new methodology and a computer automated tool for fault tree analysis in chemical process industries [J].
Khan, FI ;
Abbasi, SA .
JOURNAL OF HAZARDOUS MATERIALS, 2000, 75 (01) :1-27
[10]  
Khan FI, 1999, ENVIRON MODELL SOFTW, V14, P11, DOI 10.1016/S1364-8152(97)00031-5