Optimal admission control and sequencing in a make-to-stock/make-to-order production system

被引:117
作者
Carr, S [1 ]
Duenyas, I
机构
[1] Univ Calif Los Angeles, Anderson Grad Sch Management, Los Angeles, CA 90024 USA
[2] Univ Michigan, Sch Business, Ann Arbor, MI 48109 USA
关键词
D O I
10.1287/opre.48.5.709.12401
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we address the problem of admission control and sequencing in a production system that produces two classes of products. The first class of products is made-to-stock, and the firm is contractually obliged to meet demand for this class of products. The second class of products is made-to-order, and the firm has the option to accept (admit) or reject a particular order. The problem is motivated by suppliers in many industries who sign contracts with large manufacturers to supply them with a given product and also can take on additional orders from other sources on a make-to-order basis. We model the joint admission control/sequencing decision in the context of a simple two-class M/M/1 queue to gain insight into the following problems: 1. How should a firm decide (a) when to accept or reject an additional order, and (b) which type of product to produce next? 2. How should a firm decide what annual quantity of orders to commit to when signing a contract to produce the make-to-stock products?
引用
收藏
页码:709 / 720
页数:12
相关论文
共 27 条
[1]  
ANUPINDI R, 1994, MANAGING STOCHASTIC
[2]   THE STRATEGIC USE OF CAPACITY SLACK IN THE ECONOMIC LOT SCHEDULING PROBLEM WITH RANDOM DEMAND [J].
BOURLAND, KE ;
YANO, CA .
MANAGEMENT SCIENCE, 1994, 40 (12) :1690-1704
[3]   SINGLE FACILITY DUE-DATE SETTING WITH MULTIPLE CUSTOMER CLASSES [J].
DUENYAS, I .
MANAGEMENT SCIENCE, 1995, 41 (04) :608-619
[4]   Production quotas as bounds on interplant JIT contracts [J].
Duenyas, I ;
Hopp, WJ ;
Bassok, Y .
MANAGEMENT SCIENCE, 1997, 43 (10) :1372-1386
[5]   Heuristic scheduling of parallel heterogeneous queues with set-ups [J].
Duenyas, I ;
VanOyen, MP .
MANAGEMENT SCIENCE, 1996, 42 (06) :814-829
[6]   The stochastic Economic Lot Scheduling Problem: Cyclical base-stock policies with idle times [J].
Federgruen, A ;
Katalan, Z .
MANAGEMENT SCIENCE, 1996, 42 (06) :783-796
[7]  
FEDERGRUEN A, 1994, MAKE TO STOCK MAKE T
[8]   SCHEDULING THE PRODUCTION OF SEVERAL ITEMS WITH RANDOM DEMANDS IN A SINGLE FACILITY [J].
GALLEGO, G .
MANAGEMENT SCIENCE, 1990, 36 (12) :1579-1592
[9]   MONOTONE OPTIMAL-CONTROL OF PERMUTABLE GSMPS [J].
GLASSERMAN, P ;
YAO, DD .
MATHEMATICS OF OPERATIONS RESEARCH, 1994, 19 (02) :449-476
[10]   Optimal dynamic scheduling policy for a make-to-stock production system [J].
Ha, AY .
OPERATIONS RESEARCH, 1997, 45 (01) :42-53