Economic dispatch with network and ramping constraints via interior point methods

被引:107
作者
Irisarri, G [1 ]
Kimball, LM
Clements, KA
Bagchi, A
Davis, PW
机构
[1] Open Access Technol Int, Minneapolis, MN 55427 USA
[2] Worcester Polytech Inst, Worcester, MA 01609 USA
基金
美国国家科学基金会;
关键词
D O I
10.1109/59.651641
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
We describe an approach to the economic dispatch problem that combines both time-separated constraints (e.g., demand and network flow) and inter-temporal constraints (e.g., ramping) into a single optimization problem that can be solved efficiently by interior point methods. By including generator ramping limits as well as network line flow constraints, both economic and security issues are treated simultaneously, avoiding nd hoc post processing. We present several test cases, including dispatching six generators on the IEEE 30-bus network over 168 hours with line flow and ramping constraints. Computational effort as measured by iteration counts or execution time (CPU sees) varies only modestly with problem size.
引用
收藏
页码:236 / 242
页数:7