Optimization of standby safety system maintenance schedules in nuclear power plants

被引:89
作者
Harunuzzaman, M [1 ]
Aldemir, T [1 ]
机构
[1] OHIO STATE UNIV,DEPT MECH ENGN,NUCL ENGN PROGRAM,COLUMBUS,OH 43210
关键词
dynamic programming; maintenance optimization; reliability-centered maintenance;
D O I
10.13182/NT96-A35215
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
A methodology and a computational scheme are developed based on dynamic programming (DP) to find the minimum cost maintenance schedule for nuclear power plant standby safety systems. Surveillance and testing are assumed to return the component to as-good-as-new condition whether accompanied by restorative maintenance only or full repair or replacement. The methodology defines component state as the number of unsurveilled and untested maintenance intervals or stages, and the optimization process is decomposed into (a) feasibility screening and (b) DP search. This approach achieves a significant reduction in the state space over which the DP search is to be performed. The application of the scheme is demonstrated on the ten-component high-pressure injection system of a pressurized water reactor. This demonstration indicates that the scheme is viable and efficient and particularly suited to exploit any economies of scale and scope that may be present.
引用
收藏
页码:354 / 367
页数:14
相关论文
共 37 条
[1]  
[Anonymous], 1981, RELIABILITY RISK ANA
[2]  
BERNDT ER, 1990, PRACTICE ECONOMETRIC
[3]  
BONHOMME NM, 1972, THESIS CARNEGIEMELLO
[4]  
BUZACOTT JA, 1982, SCALE PRODUCTION SYS
[5]  
CHRISTER AH, 1984, J OPER RES SOC, V35, P967, DOI 10.1057/jors.1984.193
[6]   OPTIMAL STRATEGIES FOR SCHEDULING CHECKPOINTS AND PREVENTIVE MAINTENANCE [J].
COFFMAN, EG ;
GILBERT, EN .
IEEE TRANSACTIONS ON RELIABILITY, 1990, 39 (01) :9-18
[7]  
Cooper L, 1981, INTRO DYNAMIC PROGRA
[8]   RISK ANALYSIS OF SURVEILLANCE REQUIREMENTS INCLUDING THEIR ADVERSE-EFFECTS [J].
KIM, IS ;
MARTORELL, SA ;
VESELY, WE ;
SAMANTA, PK .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1994, 45 (03) :225-234
[9]   IMPROVING ALLOWED OUTAGE TIME AND SURVEILLANCE TEST INTERVAL REQUIREMENTS - A STUDY OF THEIR INTERACTIONS USING PROBABILISTIC METHODS [J].
MARTORELL, SA ;
SERRADELL, VG ;
SAMANTA, PK .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1995, 47 (02) :119-129
[10]   OPTIMUM PREVENTIVE MAINTENANCE POLICIES FOR A COMPUTER-SYSTEM WITH RESTART [J].
NAKAGAWA, T ;
NISHI, K ;
YASUI, K .
IEEE TRANSACTIONS ON RELIABILITY, 1984, 33 (04) :272-276