Duration of deposition from decelerating high-density turbidity currents

被引:33
作者
Baas, JH [1 ]
van Dam, RL
Storms, JEA
机构
[1] Univ Leeds, Sch Earth Sci, Leeds LS2 9JT, W Yorkshire, England
[2] Free Univ Amsterdam, Fac Earth Sci, NL-1081 HV Amsterdam, Netherlands
[3] Delft Univ Technol, Dept Appl Earth Sci, NL-2600 GA Delft, Netherlands
关键词
turbidity current; numerical model; accumulation time; current ripples;
D O I
10.1016/S0037-0738(00)00088-9
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Using recent advances in the stability analysis of current ripples, a new model for the calculation of duration of sediment deposition from decelerating high-density turbidity currents is proposed. The model, named TDURE, refines a duration model proposed by Alien (1991) (J. Sediment. Petrol. 61, 291-295) by calculating the accumulation time of the rippled T-e-division separately from the massive and plane parallel-laminated T-ab-divisions in Bouma-type turbidites. TDURE consists of three modules, In the first module, the accumulation time for the T-a- and T-b-divisions is approximated by assuming a linear decrease in sedimentation rate with height in the turbidite. As in the original model, a straight line is fitted through inferred sedimentation rates at the T-ab- and T-bc-boundaries. In the second module, angle of climb of ripples, thickness of the T-c-division and grain size distribution are used in empirical relationships between ripple migration rate and a grain-related mobility parameter to estimate the accumulation time of the T-c-division. In the third module, the expected development of ripple size across the T-c-division is calculated using empirical relationships between rate of development of ripple height and grain-related mobility parameter, and subsequently compared with the observed development of ripple size in the turbidite. In this way, the accuracy of the accumulation time calculated in module 2 can be verified independently. TDURE was tested using Bouma-type turbidites from the Doheny Channel (Capistrano Fm., CA, USA) and the Flysch di Motta (Calabria, Italy). Accumulation times of 12 and 10.75 min for the T-c-division, and 19 and 16 min for the T-abc-sequence were calculated for the Doheny Channel and the Flysch di Motta turbidites, respectively. Although module 3 underestimates the rate of development of current ripples near the T-bc- boundary in both beds, ripple size at the T-cd-boundary is calculated accurately. The underestimation of development rate may be caused by differences between flow conditions in experimental flumes on which the model calculations are based and turbidity-current dynamics. (C) 2000 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:71 / 88
页数:18
相关论文
共 48 条
[1]  
ALEXANDER LJD, 1980, THESIS QUEENS U KING
[2]  
Allen J.R.L., 1984, SEDIMENTARY STRUCTUR, VI, P593
[3]  
ALLEN J.R.L., 1971, J GEOL SOC LONDON, V127, P553
[4]   FEATURES OF CROSS-STRATIFIED UNITS DUE TO RANDOM AND OTHER CHANGES IN BED FORMS [J].
ALLEN, JRL .
SEDIMENTOLOGY, 1973, 20 (02) :189-202
[5]  
ALLEN JRL, 1991, J SEDIMENT PETROL, V61, P291
[6]  
[Anonymous], 1971, Geografiska Annaler, V53A, P157
[7]  
ARNOTT RWC, 1989, J SEDIMENT PETROL, V59, P1062
[8]   DEPOSITION OF CLIMBING-RIPPLE BEDS - A FLUME SIMULATION [J].
ASHLEY, GM ;
SOUTHARD, JB ;
BOOTHROYD, JC .
SEDIMENTOLOGY, 1982, 29 (01) :67-79
[9]  
BAAS JH, 1995, J SEDIMENT RES A, V65, P431
[10]   A FLUME STUDY ON THE DEVELOPMENT AND EQUILIBRIUM MORPHOLOGY OF CURRENT RIPPLES IN VERY FINE SAND [J].
BAAS, JH .
SEDIMENTOLOGY, 1994, 41 (02) :185-209