Investigation and characterization of mining subsidence in Kaiyang Phosphorus Mine

被引:13
作者
Deng Jian [1 ]
Bian Li
机构
[1] Cent S Univ, Sch Resources & Safety Engn, Changsha 410083, Peoples R China
[2] Cent S Univ, Sch Business, Changsha 410083, Peoples R China
来源
JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY | 2007年 / 14卷 / 03期
基金
中国国家自然科学基金;
关键词
mining subsidence; ground cracking; safety; Kaiyang Phosphorus Mine; cut and fill mining method;
D O I
10.1007/s11771-007-0081-5
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
In Kaiyang Phosphorus Mine, serious environmental and safety problems are caused by large scale mining activities in the past 40 years. These problems include mining subsidence, low recovery ratio, too much dead ore in pillars, and pollution of phosphorus gypsum. Mining subsidence falls into four categories: curved ground and mesa, ground cracks and collapse hole, spatting and eboulement, slope slide and creeping. Measures to treat the mining subsidence were put forward: finding out and managing abandoned slopes, optimizing mining method (cut and fill mining method), selecting proper backfilling materials (phosphogypsum mixtures), avoiding disorder mining operation, and treating highway slopes. These investigations and engineering treatment methods are believed to be able to contribute to the safety extraction of ore and sustainable development in Kaiyang Phosphorus Mine.
引用
收藏
页码:413 / 417
页数:5
相关论文
共 15 条
[1]   Prediction of subsidence due to underground mining by artificial neural networks [J].
Ambrozic, T ;
Turk, G .
COMPUTERS & GEOSCIENCES, 2003, 29 (05) :627-637
[2]  
*CENTR S U, 2004, KAIY PHOSPH MIN REP
[3]  
*CENTR S U, 2004, KAIYANG PHOSP MIN RE
[4]  
DENG J, 2006, SCI TECHNOL, V13, P733
[5]  
FANG JQ, 2004, SCI TECHNOL, V35, P506
[6]  
FENG CF, 2001, EXPRESS INFORM MININ, V10, P5
[7]  
JIAN MX, 1999, GUIZHOU GEOLOGY, V16, P157
[8]  
Kratzsch H., 1983, Mining Subsidence Engineering
[9]  
Liu B., 1993, COMPREHENSIVE ROCK E, P781
[10]  
QIAN MG, 1997, JIANGSU MECH, V13, P7