A delayed payment method in co-ordinating a single-vendor multi-buyer supply chain

被引:35
作者
Chan, Chi Kin [3 ]
Lee, Y. C. E. [3 ]
Goyal, S. K. [1 ,2 ]
机构
[1] Concordia Univ, Dept Decis Sci, John Molson Sch Business, Montreal, PQ H3G 1M8, Canada
[2] Concordia Univ, MIS, John Molson Sch Business, Montreal, PQ H3G 1M8, Canada
[3] Hong Kong Polytech Univ, Dept Appl Math, Hong Kong, Hong Kong, Peoples R China
关键词
Synchronization; Cost sharing; Multiple buyers; Delayed payment; PERMISSIBLE DELAY; TRADE CREDIT; ORDERING QUANTITY; LOT-SIZE; POLICY; DEMAND; PRICE; TIME; DECISIONS; MODELS;
D O I
10.1016/j.ijpe.2010.04.046
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we consider a co-ordinated single-vendor multi-buyer supply chain model by synchronizing ordering and production cycles with delayed payments that are based on the buyers' order intervals. It can be shown that the synchronized cycles policy works better, in terms of total system costs, than independent optimization. While the vendor is benefited from the co-ordination by synchronized cycles, this research proposes a co-ordination mechanism that incorporates a delayed payment method which can guarantee that a buyer's total relevant cost of co-ordination will not be increased when compared with independent optimization. Most importantly, the vendor does not require any cost information from the buyers when applying this co-ordination mechanism. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:95 / 102
页数:8
相关论文
共 25 条
[1]   A joint approach for setting unit price and the length of the credit period for a seller when end demand is price sensitive [J].
Abad, PL ;
Jaggi, CK .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 83 (02) :115-122
[2]  
Axsater S, 2006, INT SER OPER RES MAN, V90, P1, DOI 10.1007/0-387-33331-2
[3]   COORDINATED VS INDEPENDENT INVENTORY REPLENISHMENT POLICIES FOR A VENDOR AND MULTIPLE BUYERS [J].
BANERJEE, A ;
BURTON, JS .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 35 (1-3) :215-222
[4]   Coordination in a single-vendor multi-buyer supply chain by synchronizing delivery and production cycles [J].
Chan, Chi Kin ;
Kingsman, Brian G. .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2007, 43 (02) :90-111
[5]   Inventory lot-size models under trade credits: A review [J].
Chang, Chun-Tao ;
Teng, Jinn-Tsair ;
Goyal, Suresh Kumar .
ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2008, 25 (01) :89-112
[6]  
CHAPMAN CB, 1984, J OPER RES SOC, V35, P1055, DOI 10.2307/2582093
[7]   The optimal inventory policies under permissible delay in payments depending on the ordering quantity [J].
Chung, KJ ;
Goyal, SK ;
Huang, YF .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 95 (02) :203-213
[8]   Lot-sizing decisions under trade credit depending on the ordering quantity [J].
Chung, KJ ;
Liao, JJ .
COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (06) :909-928
[9]   The optimal cycle time for EPQ inventory model under permissible delay in payments [J].
Chung, KJ ;
Huang, YF .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 84 (03) :307-318
[10]  
Goyal S. K., 1985, J OPERATIONAL RES SO, V36, P35