An evaluation of lot-sizing heuristics for deteriorating inventory in material requirements planning systems

被引:17
作者
Ho, Johnny C. [1 ]
Solis, Adriano O.
Chang, Yih-Long
机构
[1] Columbus State Univ, D Abbott Turner Coll Business, Columbus, GA 31907 USA
[2] Univ Texas, Dept Informat & Decis Sci, El Paso, TX 79968 USA
[3] Georgia Inst Technol, Coll Management, Atlanta, GA 30332 USA
关键词
lot-sizing; material requirements planning; deteriorating inventory;
D O I
10.1016/j.cor.2005.09.020
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we consider the effects of deteriorating inventory on lot-sizing in material requirements planning systems. Five existing heuristics were extended to address the single-level lot-sizing problem with deteriorating inventory and evaluated via a largescale simulation study. Three factors were taken into consideration for the simulation study, namely, rate of inventory deterioration, percentage of periods with zero demand, and setup cost. Our computational results, undertaken within a wide range of experimental conditions, indicate that one of the modified heuristics exhibits the best overall cost performance. We also provide insights in regard to the cost performance behavior of the five modifted heuristics.
引用
收藏
页码:2562 / 2575
页数:14
相关论文
共 22 条
[1]  
[Anonymous], PRODUCTION INVENTORY
[2]  
[Anonymous], J OPER MANAGE
[3]   EVALUATION OF LOT-SIZING TECHNIQUES [J].
AXSATER, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (01) :51-57
[4]  
Baker K. R., 1989, Journal of Manufacturing and Operations Management, V2, P199
[5]  
Berry W. L., 1972, PRODUCTION INVENTORY, V13, P19
[6]  
Blackburn J. D., 1979, Production and Inventory Management, V20, P42
[7]  
Blackburn J. D., 1980, Decision Sciences, V11, P691, DOI 10.1111/j.1540-5915.1980.tb01170.x
[8]   AN ECONOMIC LOT-SIZING TECHNIQUE .I. PART-PERIOD ALGORITHM [J].
DEMATTEIS, JJ .
IBM SYSTEMS JOURNAL, 1968, 7 (01) :30-+
[9]  
Eftekharzadeh R., 1993, International Journal of Physical Distribution & Logistics Management, V23, P30, DOI 10.1108/09600039310025606
[10]  
Gorham T., 1968, PROD INVENTORY MANAG, V9, P75