The stochastic U-Line balancing problem

被引:53
作者
Guerriero, F
Miltenburg, J
机构
[1] McMaster Univ, Hamilton, ON L8S 4M4, Canada
[2] Ohio Univ Chillocothe, Chillicothe, OH 45601 USA
关键词
ASSEMBLY LINES; ALGORITHMS;
D O I
10.1002/nav.10043
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
A U-line arranges tasks around a U-shaped production line and organizes them into stations that can cross from one side of the line to the other. In addition to improving visibility and communication between operators on the line, which facilitates problem-solving and quality improvement, U-lines can reduce the total number of operators required on the line and make rebalancing the line easier compared to the traditional, straight production line. This paper studies the (type 1) U-line balancing problem when task completion times are stochastic. Stochastic completion times occur when differences between operators cause completion times to vary somewhat and when machine processing times vary. A recursive algorithm is presented for finding the optimal solution when completion times have any distribution function. An equivalent shortest path network is also presented. An improvement for the special case of normally distributed task completion times is given. A computational study to determine the characteristics of instances that can be solved by the algorithms shows that they are able to solve instances of practical size (like the 114 Japanese and U.S. U-lines studied in a literature review paper). (C) 2002 Wiley Periodicals, Inc.
引用
收藏
页码:31 / 57
页数:27
相关论文
共 35 条
[1]   A SURVEY OF EXACT ALGORITHMS FOR THE SIMPLE ASSEMBLY LINE BALANCING PROBLEM [J].
BAYBARS, I .
MANAGEMENT SCIENCE, 1986, 32 (08) :909-932
[2]   A DYNAMIC-PROGRAMMING APPROACH TO STOCHASTIC ASSEMBLY LINE BALANCING [J].
CARRAWAY, RL .
MANAGEMENT SCIENCE, 1989, 35 (04) :459-471
[3]  
CROSS K, 1988, IND ENG JAN, P52
[4]   A COMPREHENSIVE LITERATURE-REVIEW AND ANALYSIS OF THE DESIGN, BALANCING AND SCHEDULING OF ASSEMBLY SYSTEMS [J].
GHOSH, S ;
GAGNON, RJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (04) :637-670
[5]  
GRYGA J, 1995, MAT HANDLING ENG, V50, P34
[6]   AN ALGORITHM FOR THE LINE BALANCING PROBLEM [J].
GUTJAHR, AL ;
NEMHAUSER, GL .
MANAGEMENT SCIENCE, 1964, 11 (02) :308-315
[7]   FAST, EFFECTIVE ALGORITHMS FOR SIMPLE ASSEMBLY LINE BALANCING PROBLEMS [J].
HACKMAN, ST ;
MAGAZINE, MJ ;
WEE, TS .
OPERATIONS RESEARCH, 1989, 37 (06) :916-924
[8]   ASSEMBLY-LINE BALANCING - DYNAMIC-PROGRAMMING WITH PRECEDENCE CONSTRAINTS [J].
HELD, M ;
KARP, RM ;
SHARESHIAN, R .
OPERATIONS RESEARCH, 1963, 11 (03) :442-459
[9]  
HENIG MI, 1986, COMPUT OPER RES, V14, P443
[10]   EUREKA - A HYBRID SYSTEM FOR ASSEMBLY LINE BALANCING [J].
HOFFMANN, TR .
MANAGEMENT SCIENCE, 1992, 38 (01) :39-47