Component procurement and end product assembly in an uncertain supply and demand environment

被引:16
作者
Bollapragada, Ramesh [1 ]
Kuppusamy, Saravanan [2 ]
Rao, Uday S. [3 ]
机构
[1] San Francisco State Univ, Coll Business, Decis Sci Dept, San Francisco, CA 94132 USA
[2] Quinnipiac Univ, Sch Business, Hamden, CT USA
[3] Univ Cincinnati, Carl H Linder Coll Business, Cincinnati, OH USA
关键词
component procurement; stochastic programming; supply and demand uncertainties; TO-ORDER SYSTEM; PRODUCTION PLANNING-MODEL; OF-THE-ART; INVENTORY CONTROL; POLICIES; IMPACT; YIELD;
D O I
10.1080/00207543.2014.951522
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we examine a multi-product, multi-component, procurement and assembly problem with both supply and demand uncertainties. We explicitly model the uncertainty using a stochastic program that facilitates procurement and assembly decisions. We present a stochastic linear programming model of the problem which we solve using its deterministic equivalent with a finite number of scenarios. We show that the systems performance, i.e. total cost, depends on the order lead time, L, and the assembly lead time Q, only through their sum [GRAPHICS] . We illustrate the impact of [GRAPHICS] on system performance with numerical experiments. Also, we illustrate that, in some cases, increasing supplier capacity can worsen system performance. In addition, we identify the key cost drivers that need attention from managers in the manufacturing industry, when there is limited knowledge of future demand and component availability.
引用
收藏
页码:969 / 982
页数:14
相关论文
共 26 条
[1]   DIVERSIFICATION UNDER SUPPLY UNCERTAINTY [J].
ANUPINDI, R ;
AKELLA, R .
MANAGEMENT SCIENCE, 1993, 39 (08) :944-963
[2]   The supply chain trading agent competition [J].
Arunachalam, Raghu ;
Sadeh, Norman M. .
ELECTRONIC COMMERCE RESEARCH AND APPLICATIONS, 2005, 4 (01) :66-84
[3]  
Axsater S., 1993, Handbook in Operations Research and Management Science, P175, DOI 10.1016/S0927-0507(05)80184-7
[4]   Production and inventory control of a single product assemble-to-order system with multiple customer classes [J].
Benjaafar, Saif ;
ElHafsi, Mohsen .
MANAGEMENT SCIENCE, 2006, 52 (12) :1896-1912
[5]   Optimal Control of an Assembly System with Multiple Stages and Multiple Demand Classes [J].
Benjaafar, Saif ;
ElHafsi, Mohsen ;
Lee, Chung-Yee ;
Zhou, Weihua .
OPERATIONS RESEARCH, 2011, 59 (02) :522-529
[6]  
Birge JR, 2011, SPRINGER SER OPER RE, P3, DOI 10.1007/978-1-4614-0237-4
[7]   Managing two-stage serial inventory systems under demand and supply uncertainty and customer service level requirements [J].
Bollapragada, R ;
Rao, US ;
Zhang, J .
IIE TRANSACTIONS, 2004, 36 (01) :73-85
[8]  
Bollapragada R., 2006, IIE Transactions, V38, P605
[9]   A forecast-driven tactical planning model for a serial manufacturing system [J].
Chhaochhria, Pallav ;
Graves, Stephen C. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (23-24) :6860-6879
[10]   A PERIODIC REVIEW, PRODUCTION PLANNING-MODEL WITH UNCERTAIN CAPACITY AND UNCERTAIN DEMAND - OPTIMALITY OF EXTENDED MYOPIC POLICIES [J].
CIARALLO, FW ;
AKELLA, R ;
MORTON, TE .
MANAGEMENT SCIENCE, 1994, 40 (03) :320-332