Supply curve bidding of electricity in constrained power networks

被引:11
作者
Al-Agtash, Salem Y. [1 ]
机构
[1] Yarmouk Univ, Hijjawi Fac Engn, Irbid 21163, Jordan
关键词
Supply curve bidding (SCB); Electricity markets; Power schedules; LMP; SMD; INTELLIGENT AGENTS; GAMING ANALYSIS; MARKET GAMES; STRATEGIES; ENERGY; NEGOTIATIONS; EQUILIBRIA; GENCOS;
D O I
10.1016/j.energy.2010.03.019
中图分类号
O414.1 [热力学];
学科分类号
摘要
This paper presents a Supply Curve Bidding (SCB) approach that complies with the notion of the Standard Market Design (SMD) in electricity markets. The approach considers the demand-side option and Locational Marginal Pricing (LMP) clearing. It iteratively alters Supply Function Equilibria (SFE) model solutions, then choosing the best bid based on market-clearing LMP and network conditions. It has been argued that SCB better benefits suppliers compared to fixed quantity-price bids. It provides more flexibility and better opportunity to achieving profitable outcomes over a range of demands. In addition, SCB fits two important criteria: simplifies evaluating electricity derivatives and captures smooth marginal cost characteristics that reflect actual production costs. The simultaneous inclusion of physical unit constraints and transmission security constraints will assure a feasible solution. An IEEE 24-bus system is used to illustrate perturbations of SCB in constrained power networks within the framework of SDM. By searching in the neighborhood of SFE model solutions, suppliers can obtain their best bid offers based on market-clearing LMP and network conditions. In this case, electricity producers can derive their best offering strategy both in the power exchange and the long-term contractual markets within a profitable, yet secure electricity market. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2886 / 2892
页数:7
相关论文
共 29 条
[1]   Optimal supply curve bidding using Benders decomposition in competitive electricity markets [J].
Al-Agtash, S ;
Yamin, HY .
ELECTRIC POWER SYSTEMS RESEARCH, 2004, 71 (03) :245-255
[2]   Augmented Lagrangian approach to hydro-thermal scheduling [J].
Al-Agtash, S ;
Su, RJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (04) :1392-1400
[3]  
ALAGTASH S, 1998, THESIS U COLORADO
[4]  
[Anonymous], 1988, SPOT PRICING ELECT, DOI DOI 10.1007/978-1-4613-1683-1
[5]  
[Anonymous], 1996, WILEY INTERSCIENCE P
[6]  
Berry C. A., 1999, Utilities Policy, V8, P139, DOI 10.1016/S0957-1787(99)00016-8
[7]   An empirical analysis of the potential for market power in California's electricity industry [J].
Borenstein, S ;
Bushnell, J .
JOURNAL OF INDUSTRIAL ECONOMICS, 1999, 47 (03) :285-323
[8]   Price-taker bidding strategy under price uncertainty [J].
Conejo, AJ ;
Nogales, FJ ;
Arroyo, JM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2002, 17 (04) :1081-1088
[9]   Finding multiperiod Nash equilibria in pool-based electricity markets [J].
de la Torre, S ;
Contreras, J ;
Conejo, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (01) :643-651
[10]   COMPETITION IN THE BRITISH ELECTRICITY SPOT MARKET [J].
GREEN, RJ ;
NEWBERY, DM .
JOURNAL OF POLITICAL ECONOMY, 1992, 100 (05) :929-953