Sequencing a hybrid two-stage flowshop with dedicated machines

被引:42
作者
Riane, F [1 ]
Artiba, A
Elmaghraby, SE
机构
[1] FUCaM, Ctr Rech & Etud Gest Ind, B-7000 Mons, Belgium
[2] N Carolina State Univ, Dept Ind Engn, Raleigh, NC 27695 USA
[3] N Carolina State Univ, Grad Program Operat Res, Raleigh, NC 27695 USA
关键词
D O I
10.1080/00207540210159536
中图分类号
T [工业技术];
学科分类号
08 [工学];
摘要
We treat the n-job, two-stage hybrid flowshop problem with one machine in the first stage and two different machines in parallel in the second stage. The objective is to minimize the makespan. We demonstrate that the problem is NP-complete. We formulate a dynamic program, which is beyond our grasp for problems of more than 15 jobs. Our search for heuristic approaches led to the adoption of the Johnson sequence, which motivated two of the three approaches: dynamic programming and sequence-and-merge. The third approach, the greedy heuristic, was included as example of an elementary heuristic.
引用
收藏
页码:4353 / 4380
页数:28
相关论文
共 24 条
[1]
A RULE-BASED PLANNING SYSTEM FOR PARALLEL MULTIPRODUCT MANUFACTURING LINES [J].
ARTIBA, A .
PRODUCTION PLANNING & CONTROL, 1994, 5 (04) :349-359
[2]
An application of a planning and scheduling multi-model approach in the chemical industry [J].
Artiba, A ;
Riane, F .
COMPUTERS IN INDUSTRY, 1998, 36 (03) :209-229
[3]
BLAZEWICZ J, 1996, SCHEDULING COMPUTER
[4]
BOTTAGENOULAZ V, 1996, THESIS U C BERNARD L
[5]
BRASH SA, 1991, EUR J OPER RES, V51, P88
[6]
Buten R. E., 1973, Proceedings of the 1973 Sagamore Computer Conference on Parallel Processing, P130
[7]
CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
[8]
ELMAGHRABY SE, 1998, 276957906 N CAR STAT
[9]
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117