A hybrid mechanism for optimizing construction simulation models

被引:23
作者
Cheng, TM [1 ]
Feng, CW [1 ]
Chen, YL [1 ]
机构
[1] Natl Cheng Kung Univ, Dept Civil Engn, Tainan 70101, Taiwan
关键词
hybrid mechanism; construction; simulation;
D O I
10.1016/j.autcon.2004.07.014
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Simulation is a powerful tool for planning and scheduling highly repetitive tasks in a construction project. However. sensitivity analysis has to be utilized to find the best resource combination to execute the construction tasks. By performing the sensitivity analysis, various resource combinations can be evaluated in terms of their effects on the operation's production and cost. The results of the sensitivity analysis can assist project managers in planning effective resource assignments based on their goals, such as maximizing the system's production rate or minimizing the system's unit cost. However, it is time-consuming to conduct the sensitivity analysis if there are a large number of resource alternatives available. This paper proposes a hybrid mechanism that integrates heuristic algorithms and genetic algorithms to efficiently locate the best resource combination for the construction simulation optimization. Results show that this new hybrid mechanism not only locates the optimal solution but also reduces tremendous computational efforts. (C) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:85 / 98
页数:14
相关论文
共 18 条
[1]   AUTOMATED CONSTRUCTION-SIMULATION OPTIMIZATION [J].
ABOURIZK, S ;
SHI, JS .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (02) :374-385
[2]  
[Anonymous], 1989, UM CYCLONE USERS GUI
[3]  
[Anonymous], P 1992 WINT SIM C AR
[4]  
[Anonymous], GENETIC ALGORITHMS E
[5]   Simulation and genetic algorithms for ship planning and shipyard layout [J].
Bruzzone, A ;
Signorile, R .
SIMULATION, 1998, 71 (02) :74-83
[6]  
CHANG D, 1987, THESIS U MICHIGAN
[7]   An effective simulation mechanism for construction operations [J].
Cheng, TM ;
Feng, CW .
AUTOMATION IN CONSTRUCTION, 2003, 12 (03) :227-244
[8]  
CHENG TM, 2001, COST USERS MANUAL DE
[9]   Optimizing the schedule of dispatching RMC trucks through genetic algorithms [J].
Feng, CW ;
Cheng, TM ;
Wu, HT .
AUTOMATION IN CONSTRUCTION, 2004, 13 (03) :327-340
[10]  
Halpin D. W., 1992, Planning and Analysis of Construction Operations