Dynamic dispatch by constructive dynamic programming

被引:114
作者
Travers, DL [1 ]
Kaye, RJ [1 ]
机构
[1] Univ New S Wales, Sch Elect Engn, Sydney, NSW, Australia
关键词
dynamic programming; linear programming; constructive dynamic programming; dynamic dispatch; economic dispatch; ramp rates;
D O I
10.1109/59.651616
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper describes a new method of solving the dynamic dispatch problem. Boiler-turbine generators are characterised by variable operating costs and ramp rate constraints and costs. All system costs are piecewise linear. The method employs concepts from dynamic programming and linear programming. Dispatch decisions that minimise system variable cost and marginal costs are determined. Generator outputs are not discretised. Efficiency gains over dynamic programming are achieved by exploiting the underlying convex geometry of the problem and avoiding discretisation of the state space.
引用
收藏
页码:72 / 78
页数:7
相关论文
共 21 条
[1]  
[Anonymous], 2010, Dynamic programming
[2]   A RAPID METHOD FOR OPTIMIZATION OF LINEAR-SYSTEMS WITH STORAGE [J].
BANNISTER, CH ;
KAYE, RJ .
OPERATIONS RESEARCH, 1991, 39 (02) :220-232
[3]   SHORT-TERM SCHEDULING OF THERMAL-ELECTRIC GENERATORS USING LAGRANGIAN-RELAXATION [J].
BARD, JF .
OPERATIONS RESEARCH, 1988, 36 (05) :756-766
[4]   OPTIMAL DYNAMIC DISPATCH OF REAL POWER [J].
BECHERT, TE ;
KWATNY, HG .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1972, PA91 (03) :889-&
[5]  
BECHERT TE, 1976, P MILW S AUT COMP CO
[6]  
Carpentier J., 1984, P 8 POW SYST COMP C
[7]  
CASSEBOOM PD, 1989, P OPERATIONS RES SOC, P15
[8]  
COHEN AI, 1990, P 10 POW SYST COMP C
[9]   AN OPTIMIZATION-BASED METHOD FOR UNIT COMMITMENT [J].
GUAN, X ;
LUH, PB ;
YAN, H ;
AMALFI, JA .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1992, 14 (01) :9-17
[10]   LOAD-FOLLOWING AND SPINNING-RESERVE PENALTIES FOR INTERMITTENT GENERATION [J].
LEE, ST ;
YAMAYEE, ZA .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1981, 100 (03) :1203-1211