共 42 条
[1]
Zhu B. F.(2005)On the coefficient of safety on compressive stress of high concrete dams (in Chinese) Water Power 31 25-28
[2]
Zhang C. H.(2005)High dam-key science and technology problem in hydropower station construction (in Chinese) Guizhou Water Power 19 1-4
[3]
Ren Q. W.(2007)Status quo and problems on safety analysis of high arch dam (in Chinese) J Hydraul Eng 38 1023-1031
[4]
Zhang G. X.(2008)Review and prospect of hydraulic structure research (in Chinese) J China I Water Res Hydro Res 6 269-278
[5]
Zhu B. F.(2007)Finite element whole course simulation and sequential strength reduction method for safety appraisal of concrete dams (in Chinese) Water Res Hydro Eng 38 1-6
[6]
Yang B.(2007)Experiments on saturated concrete under different splitting tensile rate and mechanism on strength change (in Chinese) Eng Mech 24 105-109
[7]
Zhu B. F.(2008)Analogical project comparative study of safety evaluation for Xiaowan arch dam (in Chinese) Chin J Rock Mech Eng 27 2027-2033
[8]
Wang H. L.(2007)Whole dam and whole course finite element simulation method for safety appraisal of concrete dams (in Chinese) Dam Safety 6 9-12
[9]
Li Q. B.(2004)The geomechnical model test on stability of arch dam abutment under complex geological conditions (in Chinese) J Sichuan Univ 36 1-5
[10]
Jin F.(2006)Stability analysis and evaluation of laxiwa arch dam (in Chinese) Chin J Rock Mech Eng 25 901-905