共 39 条
[1]
Holmstrom K., TOMLAB /CPLEX - v11.2, Tomlab Optimization, (1989)
[2]
Ramazan S., Dimitrakopoulos R., Traditional and New MIP Models for Production Scheduling with In-Situ Grade Variability, Int. J. Surface Mining, Reclamation & Environment, 18, 2, (2004)
[3]
Caccetta L., Hill S.P., An Application of Branch and Cut to Open Pit mine Scheduling, J. Global Optimization, 27, (2003)
[4]
Gershon M., Heuristic Approaches for Mine Planning and Production Scheduling, Geotechnical and Geological Engineering, 5, 1-5, (1987)
[5]
XPAC Autoscheduler, (1996)
[6]
Whittle Strategic Mine Planning Software, (1998)
[7]
NPV Scheduler, (2008)
[8]
Lerchs H., Grossmann I.F., Optimum Design of Open-Pit Mines, The Canadian Mining and Metallurgical Bulletin, Transactions, 67, (1965)
[9]
Askari-Nasab H., Frimpong S., Awuah-Offei K., Intelligent Optimal Production Scheduling Estimator, Proc. 32nd Application of Computers and Operation Research in the Mineral Industry, (2005)
[10]
Askari-Nasab H., Intelligent 3D Interactive Open Pit Mine Planning and Optimization, (2006)