共 25 条
[1]
Dai H. C.(2006)Management and construction of the Three Gorges Project J Constr Eng Manag ASCE 132 615-619
[2]
Cao G. J.(2004)Application of fuzzy dynamic planning in the short-term optimized operation of the TGP Cascade Power Station Water Res Hydropow Eng (in Chinese) 35 89-93
[3]
Su H. Z.(2002)Application of random dynamic planning in the long-term optimized operation of the TGP Cascade Power Station Electr Power Autom Equip (in Chinese) 22 54-57
[4]
Zou J.(2003)Neural networks and reinforcement learning in control of water system J Water Res Plan Manag 129 458-465
[5]
Zhang Y. C.(2002)Machine learning in real-time control of water systems Urban Water 4 283-289
[6]
Wang J. W.(2006)Research on the function of long-and medium-term operation of reservoirs based on genetic algorithm Water Power (in Chinese) 32 92-94
[7]
Yuan X. H.(2004)Research on optimized operation of hydropower stations based on parallel combined simulated annealing algorithm J Hydroelectr Eng (in Chinese) 23 16-20
[8]
Zhang Y. C.(2005)Analysis of optimized operation in the GZB Dam Hydropower Plant J Chongqing University (Nat Sci Ed) (in Chinese) 28 32-35
[9]
Bhattacharya B.(2003)Optimized operation scheme for deposition reduction and enhancement flood control capacity of Three Gorges Project reservoir J Hydr Eng (in Chinese) 3 12-19
[10]
Lobbrecht A. H.(undefined)undefined undefined undefined undefined-undefined