An evaluation model of product upgradeability for remanufacture

被引:7
作者
Ke Xing
Martin Belusko
Lee Luong
Kazem Abhary
机构
[1] University of South Australia,School of Advanced Manufacturing and Mechanical Engineering
[2] University of South Australia,Sustainable Energy Centre
来源
The International Journal of Advanced Manufacturing Technology | 2007年 / 35卷
关键词
End-of-life; Remanufacture; Upgradeability; Reusability; Modularity; Evaluation model; Fuzzy set theory;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, a mathematical model of product upgradeability is proposed to provide a holistic measure at the design stage for a product’s potential to serve an extended use life and accommodate incremental changes/improvements of its functionality in the context of remanufacture. By using fuzzy set theory, the formulation of upgradeability model is focused on representing and measuring the effects of essential product technical factors. The ease-of-upgrade feature of a product is represented in terms of its technological, functional, physical, as well as structural fitness. Subsequently, three key indicators, namely compatibility to generational variety (CGV), fitness for extended utilisation (FEU), and life cycle oriented modularity (LOM) are developed to feature and evaluate the overall upgradeability potential of a product, providing insightful indications for any further improvement or redesign to base on.
引用
收藏
页码:1 / 14
页数:13
相关论文
共 12 条
[1]  
Belusko M(2004)Roof-integrated solar heating system with glazed collector Sol Energy 76 61-69
[2]  
Saman W(1984)Machine tool remanufacturing Manuf Eng 92 88-98
[3]  
Droda TJ(1998)Implications of modularity on product design for the life cycle J Mech Des 120 483-490
[4]  
Newcomb NJ(1997)Model-year architectures for rapid prototyping J VLSI Signal Process 15 83-96
[5]  
Bras B(2000)Disassembly analysis for electromechanical products: a graph-based heuristic approach Int J Prod Res 38 995-1007
[6]  
Pridmore J(2004)Make it new Aviat Week Space Technol 161 56-57
[7]  
Bunchanan G(2003)Prescribing the content and timing of product upgrades IIE Trans 35 647-663
[8]  
Tsai CK(undefined)undefined undefined undefined undefined-undefined
[9]  
Zhang HC(undefined)undefined undefined undefined undefined-undefined
[10]  
Well R(undefined)undefined undefined undefined undefined-undefined