Multi-contextual ant colony optimization of intermediate dynamic job shop problems

被引:1
作者
Ming-Shiun Lu
Richard Romanowski
机构
[1] Feng Chia University,
来源
The International Journal of Advanced Manufacturing Technology | 2012年 / 60卷
关键词
Stochastic; Dynamic job arrival; Job shop; Ant colony optimization;
D O I
暂无
中图分类号
学科分类号
摘要
Myopic scheduling uses information without correct context. Because job shops with dynamic job arrival are NP-hard, real-world planners often resort to myopic dispatching rules that produce schedules with unsatisfactory makespans and mean flow times. If metaheuristic scheduling does not use context properly, it can produce unsatisfactory schedules. This study proposes a new theory of context-dependent and multi-contextual scheduling functions in dynamic job shops. Three multi-contextual ant colony (MCAC) scheduling methods, SPT_MIT_JWT, MRT_MIT, and LRT_MIT_JWT, were designed to combine several context-dependent functions so that each ant had an independent, artificially intelligent model of what might happen in the future. These three MCACs scheduled 27 dynamic job shops. Each job shop had three parameters (number of operations per job, processing time per operation, and utilization level) at one of three levels. The results were compared to schedules from dispatching rules. Schedules from MRT_MIT had the best makespans for all 27 combinations of factors. For five cases in which utilization and operations per job were both high, schedules from longest processing time had the best mean flow time; in the other 22 cases, either SPT_MIT_JWT or LRT_MIT_JWT produced the schedule with the best mean flow time. These results indicate that the new theory can be used to design multi-contextual methods that produce effective schedules.
引用
收藏
页码:667 / 681
页数:14
相关论文
共 81 条
[1]  
Subramaniam V(2000)Machine selection rules in a dynamic job shop Int J Adv Manuf Technol 16 902-908
[2]  
Lee GK(2000)Efficient jobshop dispatching rules: further developments Prod Plan Cont 11 171-178
[3]  
Ramesh T(2000)Analysis of reactive scheduling problems in a job shop environment Eur J Oper Res 126 567-586
[4]  
Hong GS(2002)Scheduling rules for dynamic shops that manufacture multi-level jobs Comput Ind Eng 44 119-131
[5]  
Wong YS(2004)An ant colony system for permutation flow-shop sequencing Comput Oper Res 31 791-801
[6]  
Holthaus O(2004)Efficient dispatching rules for dynamic job shop scheduling Int J Adv Manuf Technol 24 70-75
[7]  
Rajendran C(2004)Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flow time of jobs Eur J Oper Res 155 426-438
[8]  
Sabuncuoglu I(2004)Dynamic rescheduling that simultaneously considers efficiency and stability Comput Ind Eng 46 1-15
[9]  
Bayiz M(2005)Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem Adv Eng Sofw 36 199-205
[10]  
Mohanasundaram KM(2007)Hybrid ant colony optimization and visibility studies applied to a job-shop scheduling problem Appl Math Comput 187 989-998