共 81 条
[1]
Subramaniam V(2000)Machine selection rules in a dynamic job shop Int J Adv Manuf Technol 16 902-908
[2]
Lee GK(2000)Efficient jobshop dispatching rules: further developments Prod Plan Cont 11 171-178
[3]
Ramesh T(2000)Analysis of reactive scheduling problems in a job shop environment Eur J Oper Res 126 567-586
[4]
Hong GS(2002)Scheduling rules for dynamic shops that manufacture multi-level jobs Comput Ind Eng 44 119-131
[5]
Wong YS(2004)An ant colony system for permutation flow-shop sequencing Comput Oper Res 31 791-801
[6]
Holthaus O(2004)Efficient dispatching rules for dynamic job shop scheduling Int J Adv Manuf Technol 24 70-75
[7]
Rajendran C(2004)Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flow time of jobs Eur J Oper Res 155 426-438
[8]
Sabuncuoglu I(2004)Dynamic rescheduling that simultaneously considers efficiency and stability Comput Ind Eng 46 1-15
[9]
Bayiz M(2005)Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem Adv Eng Sofw 36 199-205
[10]
Mohanasundaram KM(2007)Hybrid ant colony optimization and visibility studies applied to a job-shop scheduling problem Appl Math Comput 187 989-998