共 66 条
- [1] B?a?ewicz J.(1983)Scheduling subject to resource constraints Discrete Applied Mathematics 5 11-24
- [2] Lenstra J.K.(1993)Heuristics for scheduling projects with resource restrictions and several resource-duration modes International Journal of Production Research 31 2547-2558
- [3] Rinnooy Kan A.H.G.(1996)Resource-constrained project scheduling by simulated annealing International Journal of Production Research 34 2335-2351
- [4] Boctor F.F.(1996)A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes European Journal of Operational Research 90 349-361
- [5] Boctor F.F.(1998)A branch and bound algorithm for the resource-constrained project scheduling problem European Journal of Operational Research 107 272-288
- [6] Boctor F.F.(1985)Thermodynamical approach to the traveling salesman problem: an efficient simulation algorithm Journal of Optimization Theory and Applications 45 41-51
- [7] Brucker P.(1997)A simulated annealing algorithm for the resource-constrained project scheduling problems Journal of the Operational Research Society 48 736-744
- [8] Knust S.(1992)A branch-and-bound procedure for the multiple resourceconstrained project scheduling problem Management Science 38 1803-1818
- [9] Schoo A.(1993)Nonpreemptive multi-mode resource-constrained project scheduling IIE Transactions 25 74-81
- [10] Thiele O.(1998)A competitive genetic algorithm for resource-constrained project scheduling Naval Research Logistics 45 733-750