An Exact Procedure for the Resource-Constrained Weighted Earliness–Tardiness Project Scheduling Problem

被引:3
作者
Mario Vanhoucke
Erik Demeulemeester
Willy Herroelen
机构
[1] Katholieke Universiteit Leuven,Operations Management Group, Department of Applied Economics
来源
Annals of Operations Research | 2001年 / 102卷
关键词
resource-constrained project scheduling; weighted earliness–tardinesss costs; branch-and-bound;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper we study the resource-constrained project scheduling problem with weighted earliness–tardinesss penalty costs. Project activities are assumed to have a known deterministic due date, a unit earliness as well as a unit tardiness penalty cost and constant renewable resource requirements. The objective is to schedule the activities in order to minimize the total weighted earliness–tardinesss penalty cost of the project subject to the finish–start precedence constraints and the constant renewable resource availability constraints. With these features the problem becomes highly attractive in just-in-time environments.
引用
收藏
页码:179 / 196
页数:17
相关论文
共 19 条
[1]  
De Reyck B.(1996)A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations European Journal of Operational Research 111 125-174
[2]  
Herroelen W.(1998)An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations Computers and Operations Research 25 1-17
[3]  
De Reyck B.(1992)A branch-and-bound procedure for the multiple resourceconstrained project scheduling problem Management Science 38 1803-1818
[4]  
Herroelen W.(1997)New benchmark results for the resource-constrained project scheduling problem Management Science 43 1485-1492
[5]  
Demeulemeester E.(1997)Project network models with discounted cash flows: A guided tour through recent developments European Journal of Operational Research 100 97-121
[6]  
Herroelen W.(1996)A branch-and-bound procedure for the resource-constrained project scheduling problem with discounted cash flows Management Science 42 1395-1408
[7]  
Demeulemeester E.(1995)Characterization and generation of a general class of resourceconstrained project scheduling problems Management Science 41 1693-1703
[8]  
Herroelen W.(1970)An experimental and comparative evaluation of production line balancing techniques Management Science 16 728-746
[9]  
Herroelen W.(1966)Allocation of resources-CPM Revue Française de Recherche Opérationelle 38 31-38
[10]  
Van Dommelen P.(1984)A comparison of exact procedures for solving the multiple resource-constrained project scheduling problem Management Science 30 854-867