Lot-sizing for a single-stage single-product production system with rework of perishable production defectives

被引:52
作者
Ruud H.Teunter
Simme Douwe P. Flapper
机构
[1] Econometric Institute, Erasmus University, 3000 DR Rotterdam
[2] Department of Technology Management, Eindhoven University of Technology, 5600 MB Eindhoven
关键词
Batch production; Perishability; Rework;
D O I
10.1007/s00291-002-0105-3
中图分类号
学科分类号
摘要
We consider a single-stage single-product production system. Produced units may be non-defective, reworkable defective, or non-reworkable defective. The system switches between production and rework. After producing a fixed number (N) of units, all reworkable defective units are reworked. Reworkable defectives are perishable or can become technologically obsolete. We assume that the rework time and the rework cost increase linearly with the time that a unit is held in stock. Therefore, N should not be too large. On the other hand, N should not be too small either, since there are set-up times and costs associated with switching between production and rework. For a given N, we derive an explicit expression for the average profit (sales revenue minus costs). Using this expression, the optimal value for N can be determined numerically. Moreover, it is easy to perform a sensitivity analysis, as we illustrate.
引用
收藏
页码:85 / 96
页数:11
相关论文
共 12 条
[1]  
Baker K.R., Introduction to Sequencing and Scheduling, (1974)
[2]  
Bose S., Goswami A., Chaudhuri K.S., An EOQ model for deteriorating items with linear time-dependent demand rate and shortages under inflation and time discounting, Journal of the Operational Research Society, 46, 6, pp. 771-782, (1995)
[3]  
Chiu H.N., A heuristic (R, T) periodic review perishable inventory model with lead times, International Journal of Production Economics, 42, 1, pp. 1-16, (1995)
[4]  
Flapper S.D.P., Fransoo J.C., Broekmeulen R.A.C.M., Inderfurth K., Production planning and control of rework in the process industry, Production Planning & Control, 13, 1, pp. 26-34, (2002)
[5]  
Flapper S.D.P., Jensen T., Logistic planning and control of rework, International Journal of Production Research, (2002)
[6]  
Lee H.L., Lot sizing to reduce capacity utilization in a production process with defective items, process corrections and rework, Management Science, 38, 9, pp. 1314-1328, (1992)
[7]  
Liu J.J., Yang P., Optimal lot sizing in an imperfect production system with homogeneous reworkable jobs, European Journal of Operational Research, 91, 3, pp. 517-527, (1996)
[8]  
Nahmias S., Perishable inventory theory: A review, Operations Research, 30, 4, pp. 680-708, (1982)
[9]  
Raafat F., Survey of literature on continuous deteriorating inventory models, Journal of the Operational Research Society, 42, pp. 27-37, (1991)
[10]  
Tay G.K., Ballou D.P., An integrated production-inventory model with reprocessing and inspection, International Journal of Production Research, 26, 8, pp. 1299-1315, (1988)