共 12 条
[1]
Baker K.R., Introduction to Sequencing and Scheduling, (1974)
[2]
Bose S., Goswami A., Chaudhuri K.S., An EOQ model for deteriorating items with linear time-dependent demand rate and shortages under inflation and time discounting, Journal of the Operational Research Society, 46, 6, pp. 771-782, (1995)
[3]
Chiu H.N., A heuristic (R, T) periodic review perishable inventory model with lead times, International Journal of Production Economics, 42, 1, pp. 1-16, (1995)
[4]
Flapper S.D.P., Fransoo J.C., Broekmeulen R.A.C.M., Inderfurth K., Production planning and control of rework in the process industry, Production Planning & Control, 13, 1, pp. 26-34, (2002)
[5]
Flapper S.D.P., Jensen T., Logistic planning and control of rework, International Journal of Production Research, (2002)
[6]
Lee H.L., Lot sizing to reduce capacity utilization in a production process with defective items, process corrections and rework, Management Science, 38, 9, pp. 1314-1328, (1992)
[7]
Liu J.J., Yang P., Optimal lot sizing in an imperfect production system with homogeneous reworkable jobs, European Journal of Operational Research, 91, 3, pp. 517-527, (1996)
[8]
Nahmias S., Perishable inventory theory: A review, Operations Research, 30, 4, pp. 680-708, (1982)
[9]
Raafat F., Survey of literature on continuous deteriorating inventory models, Journal of the Operational Research Society, 42, pp. 27-37, (1991)
[10]
Tay G.K., Ballou D.P., An integrated production-inventory model with reprocessing and inspection, International Journal of Production Research, 26, 8, pp. 1299-1315, (1988)